理事会条例 (Euratom) No 2587/1999,依据欧洲原子能共同体条约第41条、确定告知委员会的投资项目

技术法规类型:欧盟Eurlex法规 来源:tbtmap

EURLEX ID:31999R2587

OJ编号:OJ L 315, 9.12.1999, p. 1-3

中文标题:理事会条例 (Euratom) No 2587/1999,依据欧洲原子能共同体条约第41条、确定告知委员会的投资项目

原文标题:Council Regulation (Euratom) No 2587/1999 of 2 December 1999 defining the investment projects to be communicated to the Commission in accordance with Article 41 of the Treaty establishing the European Atomic Energy Community

分类:12.40.50_与核能有关的其它措施

文件类型:二级立法 Regulation|条例

生效日期:1999-12-09

废止日期:2058-12-31

法规全文:查看欧盟官方文件

EUR-Lex - 31999R2587 - EN
| EUROPA > EUR-Lex > ID celex

31999R2587


Title and reference

Council Regulation (Euratom) No 2587/1999 of 2 December 1999 defining the investment projects to be communicated to the Commission in accordance with Article 41 of the Treaty establishing the European Atomic Energy Community

OJ L 315, 9.12.1999, p. 1‘� (ES, DA, DE, EL, EN, FR, IT, NL, PT, FI, SV)
CS.ES Chapter 12 Volume 02 P. 90
ET.ES Chapter 12 Volume 02 P. 90
HU.ES Chapter 12 Volume 02 P. 90
LT.ES Chapter 12 Volume 02 P. 90
LV.ES Chapter 12 Volume 02 P. 90
MT.ES Chapter 12 Volume 02 P. 90
PL.ES Chapter 12 Volume 02 P. 90
SK.ES Chapter 12 Volume 02 P. 90
SL.ES Chapter 12 Volume 02 P. 90

DA DE EL EN ES FI FR IT NL PT SV

Text

BG ES CS DA DE ET EL EN FR GA IT LV LT HU MT NL PL PT RO SK SL FI SV
html html html html html html html html html html html html html html html html html html html html html html
pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf
tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff

Dates

    of document: 02/12/1999
    of effect: 09/12/1999; Entry into force Date pub. See Art 5
    of effect: 09/03/2000; Implementation See Art 5
    end of validity: 99/99/9999

Classifications

Miscellaneous information

  • Author:
    Council
  • Form:
    Regulation

Relationship between documents

Text

Bilingual display: BG CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT RO SK SL SV

COUNCIL REGULATION (EURATOM) No 2587/1999

of 2 December 1999

defining the investment projects to be communicated to the Commission in accordance with Article 41 of the Treaty establishing the European Atomic Energy Community

THE COUNCIL OF THE EUROPEAN UNION,

Having regard to the provisions of the Treaty establishing the European Atomic Energy Community, and in particular Article 41(1) thereof,

Having regard to the proposal from the Commission,

Whereas:

(1) In order to attain the objectives laid down in the Treaty, the Commission must be notified of investment projects concerning new installations and of replacements or conversions involved in the industrial activities listed in Annex II to the Treaty when such projects are sufficiently extensive and are likely to have a direct influence on production or productivity while respecting nuclear safety;

(2) It is the responsibility of the Commission to publish periodically, in accordance with Article 40 of the Treaty, illustrative programmes and to facilitate a coordinated development of these investments and to make its point of view known about them;

(3) The investments made in the entire fuel cycle, including waste management and decomissioning are basically necessary for a correct and responsible operation of the nuclear industry;

(4) The threshold values in Regulation No 4(1) should be updated and replaced by new threshold values;

(5) Regulation No 4 should be repealed and replaced by this Regulation,

HAS ADOPTED THIS REGULATION:

Article 1

1. Persons or undertakings engaged in the industrial activities listed in Annex II to the Treaty shall communicate to the Commission, within the time limits laid down in Article 42 of the Treaty, their investment projects aimed at:

(a) creating a production capacity;

(b) maintaining quantitative and qualitative production capacity;

(c) directly increasing production capacity;

(d) directly increasing productivity;

(e) improving the quality of production;

(f) creating facilities for the management of spent fuel or radioactive waste, including treatment, interim or final storage and/or disposal;

when, in the industrial activities listed in column I of the table in the Annex, the cost exceeds the corresponding amount in column II of the table in the Annex for new installations and that in column III of the table in the Annex for replacements and conversions.

2. Investment projects aiming at decommissioning installations shall be notified, when the cost exceeds the corresponding amount in column III of the table in the Annex through a declaration which may be limited to essential characteristics; the procedure laid down in Article 43 of the Treaty need not be applied.

3. Investment projects aiming at decommissioning installations, where the costs are lower than the threshold values in column III of the table in the Annex, may be notified on a voluntary basis; the procedure laid down in Article 43 of the Treaty need not be applied.

4. Projects for new installations for nuclear reactors of any type and for any purpose and projects concerning the replacement, transformation, modernisation or power increase of such installations, where the costs are lower than the threshold values of the table in the Annex, may be notified on a voluntary basis through a simple declaration giving only their essential characteristics; the procedure laid down in Article 43 of the Treaty need not be applied.

Article 2

For the purpose of calculating the costs referred to in Article 1 all expenditure arising directly from the carrying out of the investment projects shall be taken into account, irrespective of the time at which such expenditure is incurred.

Article 3

Communication of projects pursuant to Article 1(1) of this Regulation shall include and be limited to the details required for the discussion provided for in Article 43 of the Treaty and in particular all the information relating to:

(a) the type of products or activity and the production or storage capacity;

(b) the total amount of expenditure directly chargeable to the project under consideration;

(c) the length of time likely to be required for carrying out the project;

(d) the prospects as regards supplies for and operation of the installation.

Article 4

Regulation No 4 of the Council of the European Atomic Energy Community of 15 September 1958 shall be repealed.

Article 5

This Regulation shall enter into force on the day of its publication in the Official Journal of the European Communities.

It shall apply three months after the date of its entry into force.

This Regulation shall be binding in its entirety and directly applicable in all Member States.

Done at Brussels, 2 December 1999.

For the Council

The President

E. TUOMIOJA

(1) Regulation No 4 defining the investment projects to be communicated to the Commission in accordance with Article 41 of the Treaty establishing the European Atomic Energy Community (OJ 17, 6.10.1958, p. 417/58).

ANNEX

TABLE

>TABLE>

Top

托管标准,您可以接收以下服务:

1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;

2 随时在标准托管页面中查看到该条标准的最新状态;

3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;

4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;

5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;

6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;

进入企业标准托管

您可以通过编辑查新模板,批量查询指定标准集的最新情况。我们会通过查询,向您展示您所查询标准的:

1. 准确的标准号及标准名称(我们通过人工智能技术对您提交的标准号进行自动纠正)

2. 标准的最新状态(现行、废止或未发布)

3. 若标准已废止并被新标准替代,会反馈被替代的标准

4. 若您已托管此标准,便可以实时跟踪这个标准的最新状态

标准查新 模板下载

您可以在这里检索全球超过140万条标准,支持上百个国内国际标准组织的标准查询。您也可以在这里检索国内各类国家、部委和地方的法律法规。

更多标准子库在持续建设中。

标准检索

标准资讯点击排行榜 全部

资讯标题点击

[[ n.title ]] [[ n.read ]]

大连标准化公共服务平台

版权:大连标准化研究院有限公司

地址:大连市中山区高原街56号

电话:0411-82740851

大连标准