委员会条例(EU, Euratom) No 833/2010,实施关于给委员会的关于欧盟能源基础设施的投资项目的通报的理事会条例(EU, Euratom) No 617/2010
技术法规类型:欧盟Eurlex法规 来源:tbtmap
EURLEX ID:32010R0833
OJ编号:OJ L 248, 22.9.2010, p. 36-56
中文标题:委员会条例(EU, Euratom) No 833/2010,实施关于给委员会的关于欧盟能源基础设施的投资项目的通报的理事会条例(EU, Euratom) No 617/2010
原文标题:Commission Regulation (EU, Euratom) No 833/2010 of 21 September 2010 implementing Council Regulation (EU, Euratom) No 617/2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union
分类:12.10.10_总则
文件类型:二级立法 Regulation|条例
生效日期:2010-10-12
废止日期:2058-12-31
法规全文:查看欧盟官方文件
32010R0833
Title and reference
Commission Regulation (EU, Euratom) No?833/2010 of 21?September 2010 implementing Council Regulation (EU, Euratom) No?617/2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union
?OJ L 248, 22.9.2010, p. 36–56 (BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)
?BG?CS?DA?DE?EL?EN?ES?ET?FI?FR?HU?IT?LT?LV?MT?NL?PL?PT?RO?SK?SL?SV
Text
| BG | ES | CS | DA | DE | ET | EL | EN | FR | GA | IT | LV | LT | HU | MT | NL | PL | PT | RO | SK | SL | FI | SV |
| html | html | html | html | html | html | html | html | html | ? | html | html | html | html | html | html | html | html | html | html | html | html | html |
| ? | ||||||||||||||||||||||
| tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff |
Dates
- of document: 21/09/2010
of effect: 12/10/2010; Entry into force Date pub. +20 See Art
end of validity: 99/99/9999
Classifications
- EUROVOC descriptor:
electrical energy
Community action
energy policy
petroleum
investment project
energy distribution
natural gas
EC Commission
information transfer
dataprocessing - Directory code:
12.10.10.00 Energy / General principles and programmes / General
- Subject matter:
Information and verification, Investments, Energy
Miscellaneous information
- Author:
European Commission - Form:
Regulation
Relationship between documents
- Treaty:
European Atomic Energy Community, Treaty on the Functioning of the European Union - Legal basis:
32010R0617 -A07
- Select all documents based on this document
- Amendment to:
31996R2386 Repeal
- Instruments cited:
31996R0736
- Select all documents mentioning this document
Text
| Bilingual display: BG CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT RO SK SL SV |
Commission Regulation (EU, Euratom) No 833/2010
of 21 September 2010
implementing Council Regulation (EU, Euratom) No 617/2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to the Treaty establishing the European Atomic Energy Community,
Having regard to the Council Regulation (EU, Euratom) No 617/2010 of 24 June 2010 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union and repealing Regulation (EC) No 736/96 [1], and in particular Article 7 thereof,
Whereas:
(1) The Commission is required to adopt the provisions concerning the form and other technical details of the notification of data and information referred to in Articles 3 and 5 of Regulation (EU, Euratom) No 617/2010.
(2) In order to gather comparable data and to simplify the reporting by Member States or their delegated entities or bodies referred to in Article 3 of Regulation (EU, Euratom) No 617/2010, notifications to be made should be standardized by the use of reporting tables.
(3) Following the repeal of Council Regulation (EC) No 736/96 [2], Commission Regulation (EC) No 2386/96 [3] should also be repealed,
HAS ADOPTED THIS REGULATION:
Article 1
The form and technical details of the notification to the Commission of data and information on investment projects in energy infrastructure referred to in Articles 3 and 5 of Regulation (EU, Euratom) No 617/2010 shall be as set out in the Annex to this Regulation.
Article 2
Regulation (EC) No 2386/96 is repealed.
Article 3
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 21 September 2010.
For the Commission
The President
José Manuel Barroso
[1] OJ L 180, 15.7.2010, p. 7.
[2] OJ L 102, 25.4.1996, p. 1.
[3] OJ L 326, 17.12.1996, p. 13.
--------------------------------------------------
ANNEX
O1 - OIL REFINING
Reporting year 20XX
in thousand tonnes per year
Member State
Type of infrastructure
Annex point 1.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3)+ 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity
Capacity
Number
Capacity
Number
Capacity
Number
Capacity
Capacity
Number
Capacity
Capacity
Distillation (1)
Astmospheric distillation
with CCS/CCS ready
Vacuum distillation
with CCS/CCS ready
Cracking (2)
Craking (Thermal)
Visbreaking and/or thermal
Coking
Other
with CCS or capture ready
Cracking (catalytic)
Fluid catalytic cracking
Hydrocracking
Other
with CCS or capture ready
Reforming (2)
(Naphta and isomerisation)
+++++ TIFF +++++
in thousand tonnes per year
Member State
Type of infrastructure
Annex point 1.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity
Capacity
Number
Capacity
Number
Capacity
Number
Capacity
Capacity
Number
Capacity
Capacity
with CCS or capture ready
Desulphurisation
(gasoil, HFO, other)
with CCS or capture ready
Alkylation Polymerisation Isomerisation (C4)
with CCS or capture ready
Etherification
(MTBE, TAME, ETBE)
Other
with CCS or capture ready
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for investment, delays, problems for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Installations of a capacity ≥ 1 Mio tonnes/y.
(2) Installations with a minimum capacity of 500 t/day.
+++++ TIFF +++++
O2 - OIL TRANSPORT
Reporting year 20XX
Member State
Type of infrastructure
Annex point 1.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Installations to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Crude oil transport pipelines (1)
Petroleum product pipelines (2)
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for investment, delays, problems for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) With a capacity ≥ 3 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km.
(2) With a capacity ≥ 1,5 Mio Metric tonnes/year for New pipelines + extension/lengthening ≥ 30 km.
+++++ TIFF +++++
O3 - OIL CROSS-BORDER TRANSPORT
Reporting year 20XX
Member State
Transport capacity
(Metric Tonnes per day)
Cross-border transmission projects and essential links in interconnecting national or international newtorks
Annex point 1.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 2(3) + 5 (1) c)
Infrastructure to be decommissioned (FID)
Art. 1(2) + 2(5) + 5 (2)
TEN-E projects
Supplementary info
Art. 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Ref.
TO (1)
FROM (2)
TO (1)
FROM (2)
TO (1)
FROM (2)
TO (1)
FROM (2)
TO (1)
FROM (2)
TO (1)
FROM (2)
TO (1)
FROM (2)
Crude oil pipelines
Annex point 1.2
Cross - border/interconnecting point no 1
(location - indicate MS/Third countries)
Petroleum products pipelines
Annex point 1.2
Cross - border/interconnecting point no 1
(location - indicate MS/Third countries)
NB: under construction and FID (Final Investment Decision) include renovation.
(1) To the reporting MS.
(2) From the reporting MS.
+++++ TIFF +++++
O4 - OIL STORAGE
Reporting year 20XX
Member State
Type of infrastrucutre
Annex point 1.3
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID) (1)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1)
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Storage capacity (m3)
Storage capacity (m3)
Number
Storage capacity (m3)
Number
Storage capacity (m3)
Number
Storage capacity (m3)
Storage capacity (m3)
Number
Storage capacity (m3)
Storage capacity (m3)
Crude oil
Annex 1.3
Storage installations
Tanks
Petroleum products
Annex 1.3
Storage installations
Tanks
Supplementary info
Article 5(3)
Indication of e.g. reasons for the investment, problemns, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Installations of a capacity ≥ 150 000 m3 and tanks with a capacity ≥ 100 000 m.
+++++ TIFF +++++
G1 - GAS TRANSMISSION
Reporting year 20XX
Member State
Type of infrastructure (1)
Annex point 2.1
Existing infrastructure
Art. 5(3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Iinfrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Transmission pipelines
Annex 2.1
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Total power (MW)
Number
Total power (MW)
Total power (MW)
Compressor substations (2)
Annex 2.1
Supplementary Info
Art. 5 (3)
Indication of general comments, including e.g. the case of existing installations non operational for a period of more than 3 years
NB: under construction and FID (Final Investment Decision) include renovation.
(1) See definition in Annex 2.1 of the Council regulation: Transport pipelines that form part of a network which mainly contains high-pressure pipelines excluding pipelines that form part of an upstream pipeline network and excluding the part of high pressure pipelines primarily used in the context of local distribution of natural gas.
(2) Connected to transmission pipelines.
+++++ TIFF +++++
G2 - GAS CROSS-BORDER TRANSMISSION
Reporting year 20XX
Member State
Maximum Technical transmission capacity
(Nm3/d)
Cross-border transmission infrastructure
Annex point 2.1
Existing infrastructure
Art. 5 (3)
Infrastructure Under Construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
TEN-E projects
Annex 2.1
Supplementary info (1)
Art. 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Ref.
TO (2)
FROM (3)
TO
FROM
TO
FROM
TO
FROM
TO
FROM
TO
FROM
TO
FROM
Cross - border point no 1
(location - indicate MS/Third countries)
Cross - border point no 1
(location - indicate MS/Third countries)
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Indication of e.g. of delays, problems for new infrastructure or of the reasons of the increase in technical transmission capacity at a cross-border point in the absence of investment projects in new pipelines.
(2) To the reporting MS.
(3) From the reporting MS.
+++++ TIFF +++++
G3 - LNG TERMINALS
Reporting year 20XX
Member State
Type of infrastructure
Annex point 2.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1)
Art. 1(2)+ 2(4) + 4+ 5 (1) a)
Planned infrastructure (1) (FID)
Art. 1(2)+ 2(3)+ 4+ 5 (1) a)
Additions to be commissioned (1) (under construction + FID)
Art. 1(2)+ 5 (1) c)
Infrastructure to be decommissioned (1)
Art. 1(2)+ 2(5) + 5 (2)
TEN - E project
Annex 2.1
Position at 1/1/Y
Non-operational [>3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Number
Art. 5(1) b)
Max. regasification capacity [bcm(N)/y]
- Art. 5(1) b)
Max storage capacity [cm]
Art. 5(1) b)
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation
(1) Terminals for the importation of liquefied natural gas, with a regasification capacity of 1 bcm per year or more (Annex 2.2)
+++++ TIFF +++++
G4 - GAS STORAGE
Reporting year 20XX
Member State
Type of infrastructure
Annex point 2.3
Existing infrastructure
Art. 5(3)
Infrastructure under construction (1)
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (1) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (1) (under construction + FID)
Art. 1(2) + 5 (1) c)
Iinfrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Aquifer storage
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Salt cavity
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Depleted field
Number
+++++ TIFF +++++
Member State
Type of infrastructure
Annex point 2.3
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1)
Art. 1(2) + 2(4) + 4 + 5 (1) a) + Art. 4
Planned infrastructure (1) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (1) (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Aboveground storage (2)
Number
Total storage capacity [bcm]
Working gas Capacity [bcm]
Deliverability - Max. withdrawal capacity [mcm/d]
Injectability Max.injection capacity [mcm/d]
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Installations connected to the transport pipelines.
(2) Does not include storage capacity of LNG terminals (see separate LNG tables).
+++++ TIFF +++++
E1 - ELECTRICITY PRODUCTION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 3.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity (1) (MW)
Capacity (1) (MW)
Number
Capacity (1) (MW)
Number
Capacity (1) (MW)
Number
Capacity (1) (MW)
Capacity (1) (MW)
Number
Capacity (1) (MW)
Capacity (1) (MW)
Conventional thermal power stations (≥ 100 MW) capable of burning
Annex point 3.1 + Art. 5(1) d)
Coal and lignite
with CCS/CCS ready
Oil
with CCS/CCS ready
Gas
with CCS/CCS ready
Two or more energy sources (2)
…/… (1)
with CCS or capture ready
Others
Nuclear Power Stations (≥ 100 MW) of type
Annex point 3.1 + Art. 5(1) b)
Pressurized Water Reactor
Boiling Water Reactor
Graphit Gas Reactor
Fast Breeder Reactor
Others
+++++ TIFF +++++
Member State
Type of infrastructure
Annex point 3.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity (1) (MW)
Capacity (1) (MW)
Number
Capacity (1) (MW)
Number
Capacity (1) (MW)
Number
Capacity (1) (MW)
Capacity (1) (MW)
Number
Capacity (1) (MW)
Capacity (1) (MW)
Biomass/bioliquids/waste power generation installations (≥ 20 MW) capable of burning
Annex point 3.1 + Art. 5(1) d)
Biomass
Waste
Bioliquids
Power stations with cogeneration of electricity and useful heat (electrical capacity ≥ 20 MW) capable of burning
Coal and lignite
with CCS/CCS ready
Oil
with CCS/CCS ready
Gas
with CCS/CCS ready
Biomass
Waste
Two or more energy sources (2)
…/…
with CCS/CCS ready
Hydro-electric power stations (≥ 30 MW) of the type
Annex point 3.1 + Art. 5(1) b)
Seasonal stockage (S)
Short-term stockage (ST)
+++++ TIFF +++++
Member State
Type of infrastructure
Annex point 3.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Capacity (1)
(MW)
Capacity (1) (MW)
Number
Capacity (1) (MW)
Number
Capacity (1) (MW)
Number
Capacity (1) (MW)
Capacity (1) (MW)
Number
Capacity (1) (MW)
Capacity (1) (MW)
Run-of River (R)
Pumped storage only (P)
Mixed pumped and others
Wind power farms (≥ 20 MW) of the type
Annex point 3.1 + Art. 5(1) b)
On-shore
Off-shore
Concentrated solar thermal and geothermal installations (≥ 20 MW)
Annex point 3.1
Concentrated solar thermal
Geothermal
Photovoltaic installations (≥ 10 MW)
Annex point 3.1
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Nominal capacity.
(2) For installations capable of burning more than one fuel, please indicate the power at total level and for each fuel separately.
+++++ TIFF +++++
E2 - ELECTRICITY TRANSMISSION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5 (3)
Infrastructure under Construction
Art. 1(2)+ 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y+ [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Overhead lines (≥220 kv minimum) designed for the voltage commonly used at national level for interconnections lines (select the range)
Annex 3.2
AC
[220-299 kV]
[300-359 kV]
[360-499 kV]
[x]*
DC
300-499 MW
500-699 MW
700-999 MW
1 000-1 199 MW
other
Underground lines (≥ 150 kV)
AC
[150-199 kV]
[220-299 kV]
[300-359 kV]
[360-499 kV]
other
+++++ TIFF +++++
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5(3)
Infrastructure under Construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
DC
300-499 MW
500-699 MW
700-999 MW
1 000-1 199 MW
other
Submarine lines (≥ 150 kV)
AC
[150-199 kV]
[220-299 kV]
[300-359 kV]
[380-499 kV]
other
DC
300-499 MW
500-699 MW
700-999 MW
1 000-1 199 MW
1 200-1 599 MW
other
Supplementary Info
Art. 5 (3)
Indication of e.g. the case of existing infrastructure non operational for a period of time exceeding 3 years
NB: under construction and FID ((Final Investment Decision) include renovation.
(1) Fill in in cases two voltage systems coexist within a single Member States.
+++++ TIFF +++++
E3 - ELECTRICITY CROSS-BORDER TRANSMISSION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned
(under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
TEN-E project
Annex 3.
Supplementary info
Art. 5(3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Characteristics of section in the reporting Member State (MS)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
[Yes/No]
[Yes/No]
[Yes/No]
[Yes/No]
Ref.
Overhead lines
AC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
DC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
Underground lines
AC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
DC
+++++ TIFF +++++
Member State
Type of infrastructure
Annex point 3.2
Existing infrastructure
Art. 5 (3)
Infrastructure under construction
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned
(under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned
Art. 1(2) + 2(5) + 5 (2)
TEN-E project
Annex 3.
Supplementary info
Art. 5 (3)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Characteristics of section in the reporting Member State (MS)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
Length (km)
Voltage (kV)
Transmission capacities (MVA - AC MW - DC)
[Yes/No]
[Yes/No]
[Yes/No]
[Yes/No]
Ref.
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
Submarine lines
AC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
DC
Border (MS A - MS/Country B)
Substation 1 (A)-Substation 1 (B) no 1
NB: Under construction and FID (Final Investment Decision) include renovation.
+++++ TIFF +++++
B1 - BIOFUEL PRODUCTION
Reporting year 20XX
Member State
Type of infrastructure
Annex point 4
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1)
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (1) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (1) (under construction + FID)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1)
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Annual capacity (kt)
Annual capacity (kt)
Number
Annual capacity (kt)
Number
Annual capacity (kt)
Number
Annual capacity (kt)
Annual capacity (kt)
Number
Annual capacity (kt)
Annual capacity (kt)
Installations - Unprocessed refined oil
(Pure Plant Oil)
Installations - Biofuel from oil crops
FAME (Fatty Acid Methyl Ester) and FAEE (Fatty Acid Ethyl Ester)
Oils (Hydrotreated and Refinery Co-Processed Oils)
Other
Installations - Biofuel from sugar and starch crops
Ethanol
ETBE
Other
Installations - Biofuel from lignocellulosics
Ethanol
Synthetic Biofuel (2)
Others
Methane installations from biogas
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Installations of a capacity ≥ 50 kt/year.
(2) Fischer-Tropsh, DME, ethanol, methanol, methane, pyrolysis oil etc.
+++++ TIFF +++++
C1 - CO2 TRANSPORT
Reporting year 20XX
Member State
Type of infrastructure
Annex point 5.1
Existing infrastructure
Art. 5 (3)
Infrastructure under construction (1)
Art.1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (FID) (1)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (under construction + FID) (1)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1)
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Length (km)
Number
Length (km)
Number
Length (km)
Number
Length (km)
Length (km)
Number
Length (km)
Length (km)
Dry CO2 transport pipeline
Liquid CO2 transport pipeline
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Number
Total power (MW)
Total power (MW)
Number
Total power (MW)
Total power (MW)
Compressor stations
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Pipelines related to power generation plants and refining installations.
+++++ TIFF +++++
C2 - CO2 STORAGE
Reporting year 20XX
Member State
Type of infrastructure
Annex point 5.2
Existing infrastructure
Art. 5(3)
Infrastructure under construction (1)
Art. 1(2) + 2(4) + 4 + 5 (1) a)
Planned infrastructure (1) (FID)
Art. 1(2) + 2(3) + 4 + 5 (1) a)
Additions to be commissioned (Under construction + FID) (1)
Art. 1(2) + 5 (1) c)
Infrastructure to be decommissioned (1)
Art. 1(2) + 2(5) + 5 (2)
Position at 1/1/Y
Non-operational [> 3 Y]
Position at 31/3/Y
Position at 31/3/Y
Y + [0-2]
Y + [3-5]
Y + [0-2]
Y + [3-5]
Aquifer storage
Number
Total storage capacity [kt]
Injectability Max.injection capacity [t/d]
Depleted field
Number
Total storage capacity [kt]
Injectability Max.injection capacity [t/d]
Other
Supplementary Info
Art. 5 (3)
Indication of e.g. reasons for the investment, problems, delays for new infrastructure
NB: under construction and FID (Final Investment Decision) include renovation.
(1) Installations with a capacity ≥ 100 kt.
+++++ TIFF +++++
--------------------------------------------------
| Top |
托管标准,您可以接收以下服务:
1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;
2 随时在标准托管页面中查看到该条标准的最新状态;
3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;
4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;
5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;
6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;
标准资讯点击排行榜 全部
资讯标题点击
[[ n.title ]] [[ n.read ]]大连标准化公共服务平台
版权:大连标准化研究院有限公司
地址:大连市中山区高原街56号
电话:0411-82740851