申根计划-执行委员会决定,发展申根信息系统(SCH/Com-ex (97) 24)
技术法规类型:欧盟Eurlex法规 来源:tbtmap
EURLEX ID:41997D0024
OJ编号:OJ L 239, 22.9.2000, p. 442-443
中文标题:申根计划-执行委员会决定,发展申根信息系统(SCH/Com-ex (97) 24)
原文标题:The Schengen acquis - Decision of the Executive Committee of 7 October 1997 on the development of the SIS (SCH/Com-ex (97) 24)
分类:19.40_方案
文件类型:补充立法 Decision|决定
生效日期:1997-10-07
废止日期:2058-12-31
法规全文:查看欧盟官方文件
41997D0024
Title and reference
The Schengen acquis - Decision of the Executive Committee of 7 October 1997 on the development of the SIS (SCH/Com-ex (97) 24)
OJ L 239, 22.9.2000, p. 442‘�43 (ES, DA, DE, EL, EN, FR, IT, NL, PT, FI, SV)
CS.ES Chapter 19 Volume 02 P. 400 - 401
ET.ES Chapter 19 Volume 02 P. 400 - 401
HU.ES Chapter 19 Volume 02 P. 400 - 401
LT.ES Chapter 19 Volume 02 P. 400 - 401
LV.ES Chapter 19 Volume 02 P. 400 - 401
MT.ES Chapter 19 Volume 02 P. 400 - 401
PL.ES Chapter 19 Volume 02 P. 400 - 401
SK.ES Chapter 19 Volume 02 P. 400 - 401
SL.ES Chapter 19 Volume 02 P. 400 - 401
Text
| BG | ES | CS | DA | DE | ET | EL | EN | FR | GA | IT | LV | LT | HU | MT | NL | PL | PT | RO | SK | SL | FI | SV |
| html | html | html | html | html | html | html | html | html | html | html | html | html | html | html | html | html | html | html | html | |||
Dates
- of document: 07/10/1997
of effect: 07/10/1997; Entry into force Date of document
of effect: 01/01/2001; Implementation See 300D0777
end of validity: 99/99/9999
Classifications
- EUROVOC descriptor:
information system
development policy
Norway
Iceland
financial legislation - Directory code:
19.40.00.00 Area of freedom, security and justice / Programmes
- Subject matter:
Electronic data processing
Miscellaneous information
- Author:
Schengen Agreement-Executive Committee - Form:
Decision sui generis
Relationship between documents
- Legal basis:
42000A0922(02) -A132
42000A0922(02) -A92P3
- Select all documents based on this document
- Amendment to:
31999D0435 Relation
31999D0436 Relation
42000X0922(01) Relation
- Select all documents mentioning this document
Text
| Bilingual display: CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT SK SL SV |
DECISION OF THE EXECUTIVE COMMITTEE
of 7 October 1997
on the development of the SIS
(SCH/Com-ex (97) 24)
THE EXECUTIVE COMMITTEE,
Having regard to Article 132 of the Convention implementing the Schengen Agreement,
Having regard to Article 92(3) of the abovementioned Convention,
Whereas the SIS Steering Committee has conducted an analysis (doc. SCH/OR.SIS (97) 146 rev. 2),
HAS DECIDED AS FOLLOWS:
Work carried out on SIS II will run concurrently with measures to renew the current C.SIS for 10 States. However, preparations will be made to run it for 15 States to enable the Nordic States to be integrated immediately after the SIS has been stabilised for 10 States on the new platform.
The Nordic States should be integrated as quickly as possible during the year 2000.
During implementation the following guidelines should be observed:
1. The parallel development of SIS I and SIS II will in no way affect the development of SIS II as a strategic goal. Only the SIS II will be able to meet a certain number of essential operational demands.
2. This objective should be achieved by a restricted tender procedure organised by France, as the contracting authority.
3. The parallel development of SIS I and SIS II entails all the States deciding to provide the necessary resources in terms of funding and manpower.
Vienna, 7 October 1997.
The Chairman
K. Schl枚gl
Subject: Development of the SIS
SCH/OR.SIS (97)146 Rev. 2
1. The note drafted by the PWP and the Steering Committee regarding the further development of the SIS (SCH/OR.SIS (97) 105 rev.) was presented at the meeting of the Central Group on 23 June 1997. No consensus as to how to proceed was reached at this meeting.
2. At the meeting on 8 July 1997, the Steering Committee granted the PWP a mandate to analyse the preferred scenarios again from a technical point of view and to prepare an overview of the requirements and costs.
3. Intensive work by the PWP over the summer months has resulted in note SCH/OR.SIS-SIS (97) 425 rev., attached as Annex, on the possibility for further technical development of the existing system, taking into account the participation of the Nordic States in the SIS (SCH/OR.SIS (97) 425 rev.)
During this work, and particularly during discussions with the Consortium, it transpired that a decision on the further development of the SIS must be taken quickly. Unless the system is upgraded by exchanging the hardware and software, it will probably not be able to cope with the change of date for the millennium.
According to official statements by the Consortium, no guarantee can be given that the problems in the current system can be solved. Moreover, the Consortium is of the opinion that the modifications would not be covered by the existing maintenance contracts.
4. Technical factors make it impossible to integrate the Nordic States into the SIS before the new millennium.
After studying the PWP's research, the Steering Committee recommends that the Central Group proceed as follows:
Take a decision immediately on the procedure outlined below and - in the light of the prevailing situation regarding decisions at Executive Committee level - submit this matter to the Executive Committee with a view to taking a further decision.
Work carried out on SIS II will run concurrently with measures to renew the current C.SIS for 10 States. However, preparations will be made to run it for 15 States to enable the Nordic States to be integrated immediately after the stabilisation of the 10-State SIS on the new platform.
The Nordic States should be integrated as quickly as possible during the year 2000. The project aimed at renewing and extending the SIS will therefore consist of two phases. The first phase will involve preparation of the hardware and the technical specifications for a system that operates with 15 States and implementation for 10 States. The second phase comprises the integration of the Nordic States.
During implementation account should be taken of the following guidelines:
1. The parallel development of SIS.I and SIS.II will in no way affect the development of SIS.II as a strategic goal. Only the SIS.II will be able to meet essential operational demands placed on the SIS. (The functional scope for SIS I will remain the same after renewal).
2. The Steering Committee considers that the only way of ensuring that this scenario is realised is via a restricted procedure for calls for tender. The procedure must be undertaken by France in accordance with Article 92, paragraph 3 of the Schengen Convention.
3. The parallel development of SIS.I and SIS.II requires all States to demonstrate the readiness and the will to provide the necessary resources in terms of funding and manpower. The cost of updating SIS.I is estimated at approximately FRF 16 million (excluding the cost of adapting the national Schengen Information Systems).
The Steering Committee emphasises that any delay in decision-making will jeopardise the operation of the system after 1 January 2000.
| Top |
托管标准,您可以接收以下服务:
1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;
2 随时在标准托管页面中查看到该条标准的最新状态;
3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;
4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;
5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;
6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;
标准资讯点击排行榜 全部
资讯标题点击
[[ n.title ]] [[ n.read ]]大连标准化公共服务平台
版权:大连标准化研究院有限公司
地址:大连市中山区高原街56号
电话:0411-82740851