L 284/187


COMMISSION IMPLEMENTING DECISION (EU) 2015/1960

of 29 October 2015

on the establishment of the annual priority lists for 2016 for the development of network codes and guidelines

(Text with EEA relevance)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003 (1) (‘Electricity Regulation’) and in particular Article 6(1) thereof,

Having regard to Regulation (EC) No 715/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to natural gas transmission networks and repealing Regulation (EC) No 1775/2005 (2) (‘Gas Regulation’), and in particular Article 6(1) thereof,

Whereas:

(1)

The development and implementation of network codes and guidelines is an important action to be taken in order to fully integrate the internal energy market. The Third energy package (3) has created an institutional framework for the development of network codes with a view to harmonising, where necessary, the technical, operational and market rules governing the electricity and gas grids. For this purpose the Agency for the Cooperation of Energy Regulators (‘ACER’), the European Network of Transmission System Operators (‘ENTSOs’) and the Commission work in close cooperation with all relevant stakeholders.

(2)

The areas in which network codes can be developed are set out in Articles 8(6) of the Electricity Regulation and the Gas Regulation. Despite the possibility to develop network codes the Commission may also decide to develop guidelines in the areas set out in Article 18(1), (2), (3) of the Electricity Regulation and Article 23(1) of the Gas Regulation. In accordance with Articles 6(1) of the Electricity Regulation and the Gas Regulation the Commission should first establish an annual priority list identifying the areas to be included in the development of network codes.

(3)

Harmonised gas rules on congestion management procedures, capacity allocation, balancing and interoperability and data exchange have already been adopted and published in the past three years. Harmonised electricity rules on capacity allocation and congestion management have already been adopted and published in July 2015.

(4)

In the public consultation (4) the majority of stakeholders supported the prioritization of the work already started and emphasised the importance of a proper and well-coordinated implementation of adopted network codes and guidelines whereby a structured involvement of stakeholders is ensured.

(5)

Acknowledging the responses of stakeholders and having regard to the various actions needed to ensure the full integration of the internal energy market and the fact that the implementation of network codes and guidelines will require significant resources from all relevant parties including the European Commission, ACER, ENTSOs and stakeholders, no new areas were added to the annual priority lists. In order to be able to integrate the forthcoming CEN standard on H-gas quality into the network code on interoperability and data exchange its amendment was introduced into the gas annual priority list for 2016. Harmonised rules on requirements for grid connection applicable to generators were reinserted to the electricity annual priority list for 2016 as the final adoption of this network code will take place in the beginning of 2016.

HAS ADOPTED THIS DECISION:

Article 1

This Decision establishes the annual priority lists for 2016 for the development of network codes and guidelines for electricity and gas.

Article 2

The annual priority list for 2016 for the development of harmonised electricity rules shall be the following:

network connection rules:

rules on requirements for grid connection applicable to generators (Commission continuing adoption phase after Committee voting in 2015),

demand connection (Commission continuing adoption phase after Committee voting in 2015),

rules on high-voltage direct current transmission system connection (Commission continuing adoption phase after Committee voting in 2015),

rules regarding system operations (Commission continuing adoption phase after Committee voting in 2015),

rules for longer term (forward) capacity allocation (Commission continuing adoption phase after Committee voting in 2015),

balancing rules including network-related reserve power (finalise network code and start Commission adoption phase),

rules on emergency & restoration (finalise network code and start Commission adoption phase),

rules regarding harmonised transmission tariff structures (ACER to prepare framework guideline depending on the results of ACER's scoping activity and decisions taken as part of the energy market design initiative).

Article 3

The annual priority list for 2016 for the development of harmonised gas rules shall be the following:

rules regarding harmonised transmission tariff structures (start Commission adoption phase),

rules regarding an EU-wide market-based approach on the allocation of ‘new build’ gas transmission capacity (start Commission adoption phase).

rules regarding forthcoming CEN standard on H-gas quality (draft amendment proposal to the network code on interoperability and data exchange rules and start Commission adoption phase).

Article 4

This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

Done at Brussels, 29 October 2015.

For the Commission

The President

Jean-Claude JUNCKER


(1)  OJ L 211, 14.8.2009, p. 15.

(2)  OJ L 211, 14.8.2009, p. 36.

(3)  The Third Energy Package consists of Directive 2009/72/EC of the European Parliament and of the Council (OJ L 211, 14.8.2009, p. 55), Directive 2009/73/EC of the European Parliament and of the Council (OJ L 211, 14.8.2009, p. 94), Directive 2003/55/EC of the European Parliament and of the Council (OJ L 176, 15.7.2003, p. 57), Regulation (EC) No 714/2009, Regulation (EC) No 715/2009 and Regulation (EC) No 713/2009 of the European Parliament and of the Council (OJ L 211, 14.8.2009, p. 1).

(4)  The responses are published under http://ec.europa.eu/energy/en/consultations/consultation-establishment-annual-priority-lists-development-network-codes-and.


附件:

P020171219716162572369.pdf

托管标准,您可以接收以下服务:

1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;

2 随时在标准托管页面中查看到该条标准的最新状态;

3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;

4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;

5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;

6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;

进入企业标准托管

您可以通过编辑查新模板,批量查询指定标准集的最新情况。我们会通过查询,向您展示您所查询标准的:

1. 准确的标准号及标准名称(我们通过人工智能技术对您提交的标准号进行自动纠正)

2. 标准的最新状态(现行、废止或未发布)

3. 若标准已废止并被新标准替代,会反馈被替代的标准

4. 若您已托管此标准,便可以实时跟踪这个标准的最新状态

标准查新 模板下载

您可以在这里检索全球超过140万条标准,支持上百个国内国际标准组织的标准查询。您也可以在这里检索国内各类国家、部委和地方的法律法规。

更多标准子库在持续建设中。

标准检索

标准资讯点击排行榜 全部

资讯标题点击

[[ n.title ]] [[ n.read ]]

大连标准化公共服务平台

版权:大连标准化研究院有限公司

地址:大连市中山区高原街56号

电话:0411-82740851

大连标准