委员会指令2007/32/EC,修订关于跨欧洲高速铁路系统的互用性的理事会指令96/48/EC的附录VI以及关于泛欧传统铁路系统的互通性的欧洲议会和理事会指令2001/16/EC的附录VI

技术法规类型:欧盟Eurlex法规 来源:tbtmap

EURLEX ID:32007L0032

OJ编号:OJ L 141, 2.6.2007, p. 63-66

中文标题:委员会指令2007/32/EC,修订关于跨欧洲高速铁路系统的互用性的理事会指令96/48/EC的附录VI以及关于泛欧传统铁路系统的互通性的欧洲议会和理事会指令2001/16/EC的附录VI

原文标题:Commission Directive 2007/32/EC of 1 June 2007 amending Annex VI to Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Annex VI to Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system (Text with EEA relevance)

分类:13.60_泛欧网络

文件类型:二级立法 Directive|指令

生效日期:2007-06-02

废止日期:2058-12-31

法规全文:查看欧盟官方文件

EUR-Lex - 32007L0032 - EN
| EUROPA > EUR-Lex > ID celex

32007L0032


Title and reference

Commission Directive 2007/32/EC of 1 June 2007 amending Annex VI to Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Annex VI to Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system (Text with EEA relevance)

OJ L 141, 2.6.2007, p. 63‘�6 (BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

BG CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT RO SK SL SV

Text

BG ES CS DA DE ET EL EN FR GA IT LV LT HU MT NL PL PT RO SK SL FI SV
html html html html html html html html html html html html html html html html html html html html html html
pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf
tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff

Dates

    of document: 01/06/2007
    of effect: 02/06/2007; Entry into force Date pub. See Art 4
    end of validity: 99/99/9999
    of transposition: 01/12/2007; At the latest See Art 3

Classifications

Miscellaneous information

  • Author:
    European Commission
  • Form:
    Directive
  • Addressee:
    Member States of the Community
  • Additional information:
    EEA relevance
    Directive amending

Relationship between documents

Consolidated versions

Text

Bilingual display: BG CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT RO SK SL SV

Commission Directive 2007/32/EC

of 1 June 2007

amending Annex VI to Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Annex VI to Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system

(Text with EEA relevance)

THE COMMISSION OF THE EUROPEAN COMMUNITIES,

Having regard to the Treaty establishing the European Community,

Having regard to Directive 96/48/EC of 23 July 1996 of the Council on the interoperability of the trans-European high speed rail system [1], and in particular Article 21c thereof,

Having regard to Directive 2001/16/EC of 19 March 2001 of the European Parliament and of the Council on the interoperability of the conventional rail system [2], and in particular Article 21b thereof,

Whereas:

(1) In accordance with Article 18 of Directive 96/48/EC and with Article 18 of Directive 2001/16/EC, the contracting entity or its official representative shall invite the notified body that it has selected for that purpose to apply the "EC" verification procedure referred to in Annex VI of those Directives.

(2) On the basis of the certificate of conformity issued by the notified body and of the technical file accompanying the certificate, the contracting entity or its official representative draws up an "EC" declaration of verification.

(3) Point 2 of Annex VI to Directive 96/48/EC and point 2 of Annex VI to Directive 2001/16/EC stipulate that the subsystem is checked at each of the following stages: overall design; structure of the subsystem, including, in particular, civil engineering activities, constituent assembly, overall adjustment; and final testing of the subsystem.

(4) The current concept of "final testing of the subsystem" is not sufficiently clear and precise. It consists of checking that the subsystem is in conformity with the provisions of Directives 96/48/EC and 2001/16/EC and with the other applicable regulatory provisions and that it can be placed into service, in particular by checking the interfaces with the other subsystems in operational conditions.

(5) However, there are tests which the manufacturer can carry out on the isolated interoperability constituent (IC) or subsystem, independently of the final environment in which the IC or subsystem will be installed and will be exploited. These "stand alone" tests, useful and final, are independent of the rail network on which the product will be put into service.

(6) It is therefore necessary to provide in Annex VI to both Directives 96/48/EC and 2001/16/EC the possibility for the manufacturer to apply for first step (design or production phase) assessments, which will lead to Intermediate Statements of Verification (ISV) issued by the notified body. On the basis of those ISV, the main contractor or the manufacturer will be able to draw up an "EC declaration of intermediate IC or subsystem conformity" for the relevant phase.

(7) Directives 96/48/EC and 2001/16/EC should therefore be amended accordingly.

(8) The measures provided for in this Directive are in accordance with the opinion of the Committee set up by Article 21 of Council Directive 96/48/EC,

HAS ADOPTED THIS DIRECTIVE:

Article 1

Annex VI to Directive 96/48/EC is replaced by the text in the Annex to this Directive.

Article 2

Annex VI to Directive 2001/16/EC is replaced by the text in the Annex to this Directive.

Article 3

Member States shall bring into force the laws, regulations and administrative provisions needed to comply with this Directive before 2 December 2007. They shall forthwith inform the Commission thereof.

When Member States adopt these measures, they shall contain a reference to this Directive or be accompanied by such reference on the occasion of their official publication. The methods of making such reference shall be laid down by the Member States.

Article 4

This Directive shall enter into force on the day of its publication in the Official Journal of the European Union.

Article 5

This Directive is addressed to the Member States.

Done at Brussels, 1 June 2007.

For the Commission

Jacques Barrot

Vice-President

[1] OJ L 235, 17.9.1996, p. 6. Directive as last amended by Directive 2004/50/EC of the European Parliament and of the Council (OJ L 164, 30.4.2004, p. 114, as corrected by OJ L 220, 21.6.2004, p. 40).

[2] OJ L 110, 20.4.2001, p. 1. Directive as last amended by Directive 2004/50/EC.

--------------------------------------------------

ANNEX

"ANNEX VI

VERIFICATION PROCEDURE FOR SUBSYSTEMS

1. INTRODUCTION

"EC" verification is the procedure whereby a notified body checks and certifies that a subsystem:

- complies with the Directive

- complies with the other regulations deriving from the Treaty, and may be put into operation.

2. STAGES

The subsystem is checked at each of the following stages:

- overall design,

- production: construction of subsystem, including, for example civil-engineering activities, manufacturing, constituent assembly, overall adjustment,

- final testing of the subsystem.

For the design phase (including the type tests) and for the production phase the main contractor (or the manufacturer) or its authorised representative established within the Community may apply for an assessment as a first step.

In this case, this (these) assessment(s) lead to intermediate statement verification(s) (ISV) issued by the Notified Body chosen by the main contractor (or the manufacturer). This one in turn draws up an "EC declaration of intermediate subsystem conformity" for the relevant phase(s).

3. CERTIFICATE

The Notified Body responsible for the "EC" verification draws up the certificate of verification intended for the contracting entity or its authorised representative established within the Community, which in turn draws up the "EC" declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.

The Notified Body responsible for "EC" verification assesses the design and production of the subsystem.

If available, the Notified Body takes into account the "Intermediate Statements of Verification" (ISV(s)), and, in order to issue the "EC" certificate of verification, it:

- Checks that the subsystem:

- is covered by relevant design and production ISVs delivered to the main contractor (or the manufacturer) if it has asked the Notified Body for these two phases,

- or corresponds as produced to all aspects covered by the design ISV delivered to the main contractor (or the manufacturer) if it has asked the Notified Body only for the design phase,

- Verifies that they cover correctly the requirement of the TSI and assesses the design and production elements that are not covered by the design and/or production ISV(s) delivered to the main contractor (or the manufacturer).

4. TECHNICAL FILE

The technical file accompanying the declaration of verification must be made up as follows:

- for the infrastructure: engineering-structure plans, approval records for excavations and reinforcement, testing and inspection reports on concrete, etc.,

- for the other subsystems: general and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems, operating and maintenance manuals, etc.,

- list of interoperability constituents, as referred to in Article 3, incorporated into the subsystem,

- copies of the "EC" declarations of conformity or suitability for use with which the above mentioned constituents must be provided in accordance with Article 13 of the Directive accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications,

- if available, the intermediate statement(s) of verification (ISV) and, in such a case, the "EC" declaration(s) of intermediate subsystem conformity, that accompany the "EC" certificate of verification, including the result of verification by the Notified Body of their validity,

- certificate from the Notified Body responsible for "EC" verification, accompanied by corresponding calculation notes and countersigned by itself, stating that the project complies with this Directive and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in sections 5.3 and 5.4.

5. MONITORING

5.1. The aim of "EC" monitoring is to ensure that the obligations deriving from the technical file have been met during production of the subsystem.

5.2. The Notified Body responsible for checking production must have permanent access to building sites, production workshops, storage areas and, where appropriate, prefabrication or testing facilities and, more generally, to all premises which it considers necessary for its task. The contracting entity or its authorised representative within the Community must send it or have sent to it all the documents needed for that purpose and, in particular, the implementation plans and technical documentation concerning the subsystem.

5.3. The Notified Body responsible for checking implementation must periodically carry out audits in order to confirm compliance with the Directive. It must provide those responsible for implementation with an audit report. It may require to be present at certain stages of the building operations.

5.4. In addition, the Notified Body may pay unexpected visits to the worksite or to the production workshops. At the time of such visits the Notified Body may conduct complete or partial audits. It must provide those responsible for implementation with an inspection report and, if appropriate, an audit report.

6. SUBMISSION

The complete file referred to in paragraph 4 must be lodged with the contracting entity or its authorised agent established within the Community in support of the certificate of verification issued by the Notified Body responsible for verification of the subsystem in working order. The file must be attached to the "EC" declaration of verification which the contracting entity sends to the supervisory authority in the Member State concerned.

A copy of the file must be kept by the contracting entity throughout the service life of the subsystem. It must be sent to any other Member States which so request.

7. PUBLICATION

Each Notified Body must periodically publish relevant information concerning:

- requests for "EC" verification received;

- intermediate statements of verification (ISVs) issued or refused;

- certificates of verification issued or refused.

8. LANGUAGE

The files and correspondence relating to the "EC" verification procedures must be written in an official language of the Member State in which the contracting entity or its authorised representative within the Community is established or in a language accepted by the entity."

--------------------------------------------------

Top

托管标准,您可以接收以下服务:

1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;

2 随时在标准托管页面中查看到该条标准的最新状态;

3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;

4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;

5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;

6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;

进入企业标准托管

您可以通过编辑查新模板,批量查询指定标准集的最新情况。我们会通过查询,向您展示您所查询标准的:

1. 准确的标准号及标准名称(我们通过人工智能技术对您提交的标准号进行自动纠正)

2. 标准的最新状态(现行、废止或未发布)

3. 若标准已废止并被新标准替代,会反馈被替代的标准

4. 若您已托管此标准,便可以实时跟踪这个标准的最新状态

标准查新 模板下载

您可以在这里检索全球超过140万条标准,支持上百个国内国际标准组织的标准查询。您也可以在这里检索国内各类国家、部委和地方的法律法规。

更多标准子库在持续建设中。

标准检索

标准资讯点击排行榜 全部

资讯标题点击

[[ n.title ]] [[ n.read ]]

大连标准化公共服务平台

版权:大连标准化研究院有限公司

地址:大连市中山区高原街56号

电话:0411-82740851

大连标准