委员会实施决定2012/795/EU,为报告关于工业排放的欧洲议会和理事会指令2010/75/EU的实施情况,制定各成员国应提供信息的类型,格式和频率
技术法规类型:欧盟Eurlex法规 来源:tbtmap
EURLEX ID:32012D0795
OJ编号:OJ L 349, 19.12.2012, p. 57-65
中文标题:委员会实施决定2012/795/EU,为报告关于工业排放的欧洲议会和理事会指令2010/75/EU的实施情况,制定各成员国应提供信息的类型,格式和频率
原文标题:2012/795/EU: Commission Implementing Decision of 12 December 2012 establishing the type, format and frequency of information to be made available by the Member States for the purposes of reporting on the implementation of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2012) 9181) Text with EEA relevance
分类:15.10.20.50_化学品、工业风险与生物技术
文件类型:二级立法 Decision|决定
废止日期:2058-12-31
法规全文:查看欧盟官方文件
19.12.2012 Official
Journal
of
the
European
Union L
349/57
COMMISSION IMPLEMENTING DECISION
of 12 December 2012
establishing the type, format and frequency of information to be made available by the Member
States for the purposes of reporting on the implementation of Directive 2010/75/EU of the
European Parliament and of the Council on industrial emissions
(notified under document C(2012) 9181)
(Text with EEA relevance)
(2012/795/EU)
THE EUROPEAN COMMISSION,
(3)
The Member States should also be required to submit
replies to a questionnaire in order to report for the
Having regard to the Treaty on the Functioning of the European
period 2013-2016 on representative data on emissions
Union,
and other forms of pollution, on emission limit values,
on the application of Articles 14 and 15 of Directive
Having regard to Directive 2010/75/EU of the European
2010/75/EU and on progress made concerning the devel
Parliament and of the Council of 24 November 2010 on
opment and application of emerging techniques in
industrial emissions (integrated pollution prevention and
accordance with Article 27, allowing the Commission
control) ( 1 ), and in particular Article 72(2) thereof,
to gather information on general implementation
measures (Module 1), to establish an information
Whereas:
source on individual installations that aligns with the
European Pollutant Release and Transfer Register
(1) The
Commission
has
developed
questionnaires
to
define
(Module 2), to confirm that the best available techniques
the set of information to be made available by the
have been applied correctly in permits (Module 3) and to
Member States for the purposes of reporting on the
verify the application of minimum sectoral requirements
implementation of Directive 2010/75/EU during the
(Module 4).
period 2013-2016.
(2) The
Member
States
should
be
required
to
submit
replies (4) Under
Article
72(1)
of
Directive
2010/75/EU,
Member
to a questionnaire covering only the year 2013 in order
States are to make the information available in an elec
to report on measures taken by the Member States to
tronic format.
implement those requirements of Directive 2010/75/EU
which were not already applicable in accordance with
Council Directive 78/176/EEC of 20 February 1978 on
(5)
To ensure the consistency and coherence of the Member
waste from the titanium dioxide industry (
State information, the Commission, assisted by the
2 ), Council
Directive 82/883/EEC of 3 December 1982 on
European Environment Agency, should develop a
procedures for the surveillance and monitoring of
specific electronic reporting format.
environments concerned by waste from the titanium
dioxide industry ( 3 ), Council Directive 92/112/EEC of
15 December 1992 on procedures for harmonizing the
(6) The
measures
provided
for
in
this
Decision
are
in
programmes for the reduction and eventual elimination
accordance with the opinion of the Committee estab
of pollution caused by waste from the titanium dioxide
lished by Article 75(1) of Directive 2010/75/EU,
industry ( 4 ), Council Directive 1999/13/EC of 11 March
1999 on the limitation of emissions of volatile organic
compounds due to the use of organic solvents in certain
HAS ADOPTED THIS DECISION:
activities and installations ( 5 ), Directive 2000/76/EC of
the European Parliament and of the Council of
4 December 2000 on the incineration of waste ( 6 ),
Article 1
Directive 2001/80/EC of the European Parliament and
Reporting by Member States
of the Council of 23 October 2001 on the limitation
of emissions of certain pollutants into the air from large
Member States shall make information available to the
combustion plants
( 7 ), Directive 2008/1/EC of the
European Commission on the implementation of Directive
European Parliament and of the Council of 15 January
2010/75/EU by replying to the questionnaires set out in
2008 concerning integrated pollution prevention and
Annexes I and II, using the specific electronic format to be
control ( 8 ) before their repeal by Directive 2010/75/EU.
developed for the purposes of this reporting.
( 1 ) OJ L 334, 17.12.2010, p. 17.
( 2 ) OJ L 54, 25.2.1978, p. 19.
The reply to the questionnaire set out in Annex I shall be
( 3 ) OJ L 378, 31.12.1982, p. 1.
submitted by 30 September 2014 at the latest.
( 4 ) OJ L 409, 31.12.1992, p. 11.
( 5 ) OJ L 85, 29.3.1999, p. 1.
( 6 ) OJ L 332, 28.12.2000, p. 91.
( 7 ) OJ L 309, 27.11.2001, p. 1.
The reply to the questionnaire set out in Annex II shall be
( 8 ) OJ L 24, 29.1.2008, p. 8.
submitted by 30 September 2017 at the latest.
L 349/58
EN
Official Journal of the European Union
19.12.2012
Article 2
This Decision is addressed to the Member States.
Done at Brussels, 12 December 2012.
For the Commission
Janez POTONIK
Member of the Commission
EN
19.12.2012 Official
Journal
of
the
European
Union L
349/59
ANNEX I
Questionnaire on the implementation of Directive 2010/75/EU as referred to in the second paragraph of
Article 1
General notes:
(a) The replies to this questionnaire shall cover the period from 7 January 2013 to 31 December 2013.
(b) Where a question seeks information on time-variable parameters, the response should indicate the situation as of
31 December 2013.
(c)
In the replies to the questions below, information shall only be given on the changes made by Member States in
order to implement the provisions of Directive 2010/75/EU mentioned in its Article 80(1).
(d) In this questionnaire, ‘Member State policy or guidance’ shall be understood as having the meaning of any existing
implementation measure that is produced or applied at national, regional or local level. Should a Member State
wish to include information concerning legislation that transposes Directive 2010/75/EU into national law, this
would not negate the need for Member States to meet the requirements of Article 80(2) of Directive 2010/75/EU.
1. Non-compliance
(Article
8)
What criteria may be used to decide whether a breach of permit conditions ‘poses an immediate danger to human
health or threatens to cause an immediate significant adverse effect upon the environment’?
2. Permit
conditions
(Article
14)
Provide a summary of any Member State policy or guidance on the following issues and, if published on the
internet, a link to where this can be found:
2.1. How
is
it
ensured
that
BAT
conclusions
are
the
reference
for
setting
permit
conditions
(Article
14(3))?
2.2. How may competent authorities set stricter permit conditions than those achievable by the use of the best available
techniques (BAT) as described in BAT conclusions (Article 14(4))?
3. Emission
limit
values,
equivalent
parameters
and
technical
measures
(Article
15)
Provide a summary of any Member State policy or guidance on the following issues and, if published on the
internet, a link to where this can be found:
3.1. How are emission limit values set in relation to the ‘emission levels associated with the best available techniques’ set
out in the BAT conclusions (Article 15(3))?
3.2. How are derogations from Article 15(3) granted (Article 15(4))?
3.3. How is the cost-benefit assessment to allow such derogations undertaken and what are considered to be ‘dis
proportionately higher costs compared to the environmental benefits’? (Article 15(4))?
3.4. Are there any limitations on the magnitude or duration of derogations (Article 15(4))?
3.5. How are temporary derogations granted, from the requirements of Article 11(a) and (b) and from Article 15(2) and
(3), for the testing and use of emerging techniques (Article 15(5))?
4. Monitoring
requirements
(Article
16)
Provide a summary of any Member State policy or guidance on the following issues and, if published on the
internet, a link to where this can be found:
4.1. How is it ensured that the BAT conclusions are the basis for defining monitoring requirements in permits
(Article 16(1))?
4.2. How
is
the
frequency
of
periodic
monitoring
for
soil
and
groundwater
determined
(Article
16(2))?
L 349/60
EN
Official Journal of the European Union
19.12.2012
4.3. How is a ‘systematic appraisal of risk of contamination’ used to justify the monitoring of soil and groundwater at
less than the stipulated frequency (Article 16(2))?
5. General
Binding
Rules
(Article
17)
Where general binding rules are used for implementing Directive 2010/75/EU:
5.1. Which
requirements,
activities
(as
listed
in
Annex
I
to
Directive
2010/75/EU)
and
pollutants
do
the
general
binding
rules cover?
5.2. How do general binding rules ‘ensure an integrated approach and a high level of environmental protection
equivalent to that achievable with individual permit conditions’ (Article 17(1))?
5.3. How
is
it
ensured
that
general
binding
rules
are
‘based
on
the
BAT’
(Article
17(2))?
5.4. How
are
general
binding
rules
‘updated
to
take
into
account
developments
in
BAT’
(Article
17(3))?
5.5. What references are made to Directive 2010/75/EU in the ‘official publication’ of general binding rules
(Article 17(4))?
5.6. If the general binding rules are published on the internet, provide a link to where they can be found.
6. Developments
in
BAT
(Article
19)
6.1. How do competent authorities follow, or are informed of, the publication of any new or updated BAT conclusions?
6.2. How
do
competent
authorities
make
that
information
available
to
the
public
concerned?
7. Reconsideration
and
updating
of
permits
(Article
21)
Provide a summary of any Member State policy or guidance on the following aspects of the process for recon
sidering and updating permit conditions and, if published on the internet, provide a link:
7.1. What information is typically requested from operators for the purposes of permit reconsideration/updating
(Article 21(2))?
7.2. How
is
the
‘main
activity’
of
an
installation
defined
and/or
determined
(Article
21(3))?
7.3. How is the permit reconsideration/update triggered in cases of significant pollution, operational safety, or a
new/revised environmental quality standard (Article 21(5))?
8. Site
closure
(Article
22)
8.1. How is it decided which activities require a baseline report, especially:
(a) Which activities listed in Annex I to Directive 2010/75/EU have typically been found to involve the ‘use,
production or release of relevant hazardous substances’ (Article 22(2))?
(b) How is regard given to the ‘possibility of soil and groundwater contamination at the site of the installation’
(Article 22(2))?
(c) What information are operators required to include in baseline reports (Article 22(2))?
(d) How has the Commission’s guidance on ‘the content of the baseline report’ been used in this context
(Article 22(2))?
8.2. Upon
the
definitive
cessation
of
activities:
(a) How do operators ‘assess the state of soil and groundwater contamination’ (Article 22(3))?
(b) How is it decided whether an installation has caused ‘significant pollution of soil or groundwater’ (Article 22(3))?
EN
19.12.2012 Official
Journal
of
the
European
Union L
349/61
(c) How is it decided whether any contamination of soil or groundwater ‘poses a significant risk to human health
or the environment’ (Article 22(3))?
(d) How is it decided what necessary ‘measures’ or ‘actions’ are required of operators (Article 22(3) and (4))?
9. Environmental
inspections
(Article
23)
9.1. What ‘environmental inspection plans’ have been drawn up? What do they contain? Where are they publicly
available? If published on the internet, provide a link (Article 23(2))?
9.2. What
‘programmes
for
routine
environmental
inspections’
have
been
drawn
up?
What
do
they
contain?
Where
are
they publicly available? If published on the internet, provide a link. (Article 23(4))?
9.3. How are the environmental risks of installations ‘systematically appraised’ for the purposes of deciding the site visit
frequency? Provide a summary and reference to any relevant guidance. (Article 23(4))?
9.4. Under
what
circumstances
are
‘non-routine
environmental
inspections’
carried
out
(Article
23(5))?
9.5. What information do the site visit reports typically contain? How are these reports notified to the operator? How
are they made publicly available? Are there any circumstances under which such reports have not been made
publicly available, considering the provisions of Directive 2003/4/EC of the European Parliament and of the
Council of 28 January 2003 on public access to environmental information and repealing Council Directive
90/313/EEC ( 1 ) (Article 23(6))?
9.6. What mechanisms exist for ensuring that operators complete the ‘necessary actions’ identified in the site visit report
(Article 23(6))?
10. Access
to
information
and
public
participation
(Article
24)
10.1. How is the public given ‘early and effective opportunity’ to participate in decision making on the granting/updating
of permit conditions, especially where derogations under Article 15(4) are proposed (Article 24(1))?
10.2. How is information made available to the public (Article 24(2) and (3))?
10.3. Is all relevant information made available on the internet (Article 24(2)(a),(b) and (f) and Article 24(3)(a))?
11. Emerging
techniques
(Article
27)
How do Member States encourage the development and application of emerging techniques, in particular those
identified in BAT reference documents (Article 27(1))?
( 1 ) OJ L 41, 14.2.2003, p. 26.
L 349/62
EN
Official Journal of the European Union
19.12.2012
ANNEX II
Questionnaire on the implementation of Directive 2010/75/EU as referred to in the third paragraph of Article 1
General notes:
(a) This questionnaire covers the period from 7 January 2013 to 31 December 2016.
(b) Where a question seeks information on time-variable parameters, the response should indicate the situation as of
31 December 2016.
MODULE 1 — IMPLEMENTATION UPDATE
Module 1 note:
The scope of these questions is installations covered by Chapter II of Directive 2010/75/EU.
1. Implementation
–
changes
Have any major changes to the implementation of Directive 2010/75/EU been made since the last reporting
period, compared to the information reported in response to the questionnaire for first reporting under IED? If so,
provide an update by describing the changes and the reasons for them, and provide references where appropriate.
2. Implementation
—
difficulties
Have you encountered any difficulties in applying the laws, regulations and administrative provisions adopted in
accordance with Article 80(1)? If yes, describe these difficulties and the reasons for them.
MODULE 2 – INFORMATION ON INDIVIDUAL INSTALLATIONS
Module 2 note:
Cross-references to other EU legislation are merely to identify that these interactions exist. It is not intended to map the
exact interfaces between installations covered by each of those regimes.
3. Provide
the
following
information
for
all
installations
covered
by
Chapter
II
of
Directive
2010/75/EU
(‘IED installations’)
3.1. General
information:
Field Description
3.1.1. Reference
number
of
the
IED
installation Unique
installation
identifier
for
the
purposes
of
Directive 2010/75/EU.
3.1.2. Reference
number
of
the
facility
covered
by
Regulation Where the IED installation is, fully or partly, covered by
(EC) No 166/2006 of the European Parliament and of Regulation (EC) No 166/2006, provide the identifi
the Council of 18 January 2006 concerning the estab cation number used for the reporting of the facility
lishment of a European Pollutant Release and Transfer under that Regulation.
Register and amending Council Directives 91/689/EEC
and 96/61/EC ( 1 ) (optional)
3.1.3. Reference number of the establishment covered by Where the IED installation is, fully or partly, covered by
Directive 2012/18/EU of the European Parliament Directive 2012/18/EU, provide the unique identifier
and of the Council of 4 July 2012 on the control of used in the Seveso Plant Information Retrieval System
major-accident hazards involving dangerous
(SPIRS).
substances, amending and subsequently repealing
Council Directive 96/82/EC ( 2 ) (optional)
3.1.4. Reference number of the installation covered by the Where the IED installation is, fully or partly, covered by
Directive 2003/87/EC of the European Parliament and Directive 2003/87/EC, provide the unique registry
of the Council of 13 October 2003 establishing a identifier from the EU Transaction Log.
scheme for greenhouse gas emission allowance
trading within the Community and amending
Council Directive 96/61/EC ( 3 ) (optional)
3.1.5. Installation
name
In a format compatible with the field ‘Name of the
facility’ used in the reporting under Regulation (EC)
No 166/2006; if possible.
EN
19.12.2012 Official
Journal
of
the
European
Union L
349/63
Field Description
3.1.6. Activities
covered
by
Directive
2010/75/EU All
activities
listed
in
Annex
I
to
Directive
2010/75/EU
which are operated in the installation.
3.1.7. Other
relevant
Chapters
of
Directive
2010/75/EU Indicate
which
of
the
Chapters
III,
IV,
V
and
VI
of
Directive 2010/75/EU also apply to the installation
(or part thereof).
3.2. Contact
information:
Field Description
3.2.1. Operator
name In
a
format
compatible
with
the
field
‘Name
of
parent
company’ used in the reporting under Regulation (EC)
No 166/2006, if possible.
3.2.2. Installation address — street, town, postal code and In accordance with Directive 2007/2/EC of the
country
European Parliament and of the Council of 14 March
2007 establishing an Infrastructure for Spatial
Information in the European Community ( 4 ), and in a
format compatible with the field ‘Street address’, ‘Town/
village’, ‘Postal code’, ‘Country’ used in the reporting
under Regulation (EC) No 166/2006, if possible.
3.2.3. Installation
latitude/longitude In
accordance
with
Directive
2007/2/EC,
and
in
a
format compatible with the field ‘Coordinates of the
location’ used in the reporting under Regulation (EC)
No 166/2006, if possible.
3.3. Competent
authorities:
Field Description
3.3.1. Competent
authority
for
the
granting
of
permits Name
of
competent
authority/authorities
and
address(es).
3.3.2. Competent
authority
for
inspections
and
enforcement Name of competent authority/authorities and e-mail
address(es).
3.3.3. Total number of site visits by competent authorities Annual total for each of the years 2013, 2014, 2015
(Article 23(4))
and 2016.
3.4. Permit
information:
Field Description
3.4.1. A
web
link
to
active
permits As
required
by
Article
24(2).
3.4.2. Is the installation subject to derogation under Yes/No
Article 15(4)?
3.4.3. Has
a
baseline
report
been
prepared
under
Article
22? Yes/No
( 1 ) OJ L 33, 4.2.2006, p. 1.
( 2 ) OJ L 197, 24.7.2012, p. 1.
( 3 ) OJ L 275, 25.10.2003, p. 32.
( 4 ) OJ L 108, 25.4.2007, p. 1.
L 349/64
EN
Official Journal of the European Union
19.12.2012
MODULE 3 – SECTORAL SPOTLIGHT
Module 3 notes:
The scope of this module is installations where published Decisions on BAT conclusions have triggered permit recon
sideration/updating during the reporting period, i.e. installations where the main activity is covered by:
— Commission Implementing Decision of 28 February 2012 2012/134/EU establishing the best available techniques
(BAT) conclusions under Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions
for the manufacture of glass ( 1 ); or
— Commission Implementing Decision of 28 February 2012 2012/135/EU establishing the best available techniques
(BAT) conclusions under Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions
for iron and steel production ( 2 ).
4. Permit
conditions
(Article
14)
Have any other sources of information, apart from BAT conclusions, been used as the reference for setting permit
conditions (Article 14(3))?
5. Stricter
permit
conditions
(Articles
14(4)
and
18)
5.1. Which environmental quality standards required stricter permit conditions than those achievable by the use of
BAT, and what additional measures were included in the permits (Article 18)?
5.2. Provide
examples
of
other
situations
where
the
competent
authorities
have,
under
Article
14(4),
set
stricter
permit
conditions than achievable by the use of BAT.
6. Setting
permit
conditions
in
the
absence
of
relevant
BAT
conclusions
(Article
14(5)
and
(6))
6.1. Describe
the
procedure
for,
and
examples
of,
setting
permit
conditions:
(a) on the basis of a BAT not described in any of the relevant BAT conclusions (Article 14(5));
(b) on the basis of a BAT determined in consultation with the operator, because the individual BAT conclusions
do not cover ‘an activity or a type of production process carried out within an installation’ or ‘do not address
all the potential environmental effects of the activity or process’ (Article 14(6)).
6.2. For
the
above
examples,
identify:
(a) why the information in the BAT conclusions was not applicable;
(b) which supplementary information sources were used to identify BAT;
(c) how the criteria listed in Annex III to Directive 2010/75/EU were given special consideration.
7. Emission
limit
values,
equivalent
parameters
and
technical
measures
(Article
15)
7.1. For permits where one or more emission limit value(s) are different to the emission levels associated with BAT in
the BAT conclusions in terms of values, periods of time or reference conditions (Article 15(3)(b)):
(a) describe the nature of these different emission limit values and provide examples of them;
(b) provide examples, using the data summary referred to in Article 14(1)(d)(ii), showing how emission monitoring
has been used to ‘ensure that emissions under normal operating conditions have not exceeded the emission
levels associated with the best available techniques’ (the second subparagraph of Article 15(3)).
7.2. For
all
installations
where
an
Article
15(4)
derogation
has
been
granted,
indicate
the:
(a) emission sources benefitting from a derogation;
(b) emission levels associated with BAT for which a derogation has been granted;
(c) actual emission limit values;
(d) transitional period(s) granted to comply with Article 15(3), if any;
(e) website(s) containing information on the application of Article 15(4) derogations (Article 24(2)(f)).
7.3. Have
temporary
derogations
been
granted
for
the
testing
and
use
of
emerging
techniques
(Article
15(5)).
( 1 ) OJ L 70, 8.3.2012, p. 1.
( 2 ) OJ L 70, 8.3.2012, p. 63.
EN
19.12.2012 Official
Journal
of
the
European
Union L
349/65
8. Monitoring
(Article
16)
8.1. In
general
terms,
what
monitoring
frequencies
have
been
set
in
permits
for
air
emissions,
water
emissions,
soil/groundwater emissions and other relevant process parameters?
8.2. How
have
BAT
conclusions
been
used
to
determine
these
frequencies?
9. Reconsideration
and
updating
of
permit
conditions
(Article
21)
For all permit reconsiderations that were not completed by 8 March 2016, identify:
(a) the installation names and permit reference numbers;
(b) the reasons for not having completed the reconsideration;
(c) the date by which the reconsideration will be completed.
10. Other
Do you have feedback on any practical problems you encountered in using the BAT conclusions for the two
sectors in the scope of this Module 3?
MODULE 4 – ‘MINIMUM’ REQUIREMENTS
11. Waste
incineration
and
co-incineration:
For plants covered by Chapter IV of Directive 2010/75/EU:
11.1. Identify the plants for which competent authorities have authorised conditions under Article 51(1), (2) or (3) as
well as the actual conditions authorised and the results of verifications made in this respect–(Article 51(4)).
11.2. For each waste incineration plant and waste co-incineration plant with a capacity of 2 tonnes or more per hour,
provide:
(a) information on the functioning and monitoring of the plant;
(b) an account of the running of the incineration or co-incineration process (indicating the operational hours,
number and cumulative duration of break-downs, if available);
(c) the level of emissions into air and water, in comparison with the emission limit values;
(d) a description of how this information has been made available to the public, including a link to any relevant
websites created for this purpose (Article 55(2)).
12. Solvent
Emissions
For installations covered by Chapter V of Directive 2010/75/EU:
12.1. Where Member States have opted to apply a reduction scheme (as described in Annex VII, Part 5) instead of
emission limit values, what progress has been made in achieving an equivalent emission reduction
(Article 59(1)(b))?
12.2. Identify the plants for which derogations were granted in accordance with Article 59(2) or Article 59(3), as well as
the justification for granting such derogations.
Document Outline
附件:
托管标准,您可以接收以下服务:
1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;
2 随时在标准托管页面中查看到该条标准的最新状态;
3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;
4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;
5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;
6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;
标准资讯点击排行榜 全部
资讯标题点击
[[ n.title ]] [[ n.read ]]大连标准化公共服务平台
版权:大连标准化研究院有限公司
地址:大连市中山区高原街56号
电话:0411-82740851