委员会决定2013/761/EU,已由英国的全国过渡计划通报,该计划是关于欧洲议会和理事会就工业排放物的指令2010/75/EU条款32(通报文件号C(2013) 8815)

技术法规类型:欧盟Eurlex法规 来源:tbtmap

EURLEX ID:32013D0761

OJ编号:OJ L 335, 14.12.2013, p. 52-56

中文标题:委员会决定2013/761/EU,已由英国的全国过渡计划通报,该计划是关于欧洲议会和理事会就工业排放物的指令2010/75/EU条款32(通报文件号C(2013) 8815)

原文标题:Commission Decision of 12 December 2013 on the notification by the United Kingdom of Great Britain and Northern Ireland of a transitional national plan referred to in Article 32 of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2013) 8815)

分类:15.10.30.20_野生动植物保护

文件类型:二级立法 Decision|决定

生效日期:0001-01-01

废止日期:2058-12-31

法规全文:查看欧盟官方文件

L_2013335EN.01005201.xml

14.12.2013

EN

Official Journal of the European Union

L 335/52


COMMISSION DECISION

of 12 December 2013

on the notification by the United Kingdom of Great Britain and Northern Ireland of a transitional national plan referred to in Article 32 of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions

(notified under document C(2013) 8815)

(Only the English text is authentic)

(2013/761/EU)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (1), and in particular Article 32(5) second subparagraph thereof,

Whereas:

(1)

In accordance with Article 32(5) first subparagraph of Directive 2010/75/EU, the United Kingdom of Great Britain and Northern Ireland (the United Kingdom) submitted to the Commission a transitional national plan (TNP) on 14 December 2012 (2).

(2)

The TNP has been assessed in accordance with Article 32(1), (3) and (4) of Directive 2010/75/EU and with Commission Implementing Decision 2012/115/EU (3).

(3)

During its assessment of the completeness of the TNP submitted by the United Kingdom, the Commission found that many data essential for the assessment were missing from the TNP and that the data template provided for in Table A.1 in Appendix A of the Annex to Implementing Decision 2012/115/EU was not fully completed. The Commission also noted that for many plants the data included in the TNP did not match with the data in the 2009 emission inventory submitted by the United Kingdom in accordance with Directive 2001/80/EC of the European Parliament and of the Council (4).

(4)

As the missing data and the discrepancies between the TNP and the emission inventory under Directive 2001/80/EC hampered the assessment of the TNP, the Commission, in its letter of 3 June 2013 (5), requested the United Kingdom to resubmit the TNP using the correct data templates and including the missing data, and to clarify the differences found between the TNP and the 2009 emission inventory under Directive 2001/80/EC, as well as to explicitly confirm that the aggregation rules set out in Article 29 of Directive 2010/75/EU had been applied for the compilation of the TNP.

(5)

The United Kingdom submitted additional information to the Commission on 18 June 2013 (6), 19 June 2013 (7), 20 June 2013 (8) and 1 July 2013 (9). In these submissions, the United Kingdom provided most of the missing data using the required templates, as well as a partial clarification of the differences between the information in the TNP and the 2009 emission inventory under Directive 2001/80/EC.

(6)

After further assessment of the TNP and the additional information submitted by the United Kingdom, the Commission sent a second letter on 10 September 2013 (10). In this letter, the Commission repeated its request to the United Kingdom to explicitly confirm that for all plants included in the TNP the aggregation rules set out in Article 29 of Directive 2010/75/EU were applied correctly and asked the United Kingdom to confirm that none of the combustion plants that benefited from the exemption set out in Article 4(4) of Directive 2001/80/EC was part of the TNP. The Commission further questioned the eligibility of a number of plants to be included in the TNP and requested additional data and/or clarifications concerning the average waste gas flow rates, conversion factors, total rated thermal input and emission limit values applied for certain plants, in particular multi-fuel firing plants and gas turbines. The Commission also requested the United Kingdom to provide information on the measures foreseen for 120 plants included in the TNP to ensure timely compliance with the emission limit values that will apply from 1 July 2020.

(7)

In its letter of 10 September 2013 the Commission also informed the United Kingdom that the NOx emission limit value of 1 200 mg/Nm3 for solid fuel used for the plant ‘楢berthaw Power Station‘� which contributes significantly to the overall TNP ceiling for NOx, had to be corrected as the conditions for using this limit value, that are set out in Note 2 to Table C.1 in Appendix C of the Annex to Implementing Decision 2012/115/EU, were not fulfilled for this plant during the reference period 2001-2010. According to the information available to the Commission, the United Kingdom did not demonstrate that the average annual volatile content of the solid fuel used in the plant was below 10 % in any of the years between 2001 and 2010.

(8)

In its replies of 26 and 27 September 2013 (11), the United Kingdom provided additional data and informed the Commission of the removal of 11 plants from the TNP. For the plant ‘楢berthaw Power Station‘� the United Kingdom continued to argue that the conditions set out in Note 2 to Table C.1 in Appendix C of the Annex to Implementing Decision 2012/115/EU had been fulfilled and that the NOx emission limit value of 1 200 mg/Nm3 for solid fuels used to calculate the contribution to the 2016 ceiling was therefore correct.

(9)

Based on the additional information provided, the Commission found that essential data concerning several plants were still missing from the TNP and that a full assessment of the TNP was therefore not possible, in particular in terms of consistency and correctness of the data and of the assumptions and calculations used for determining the contributions of each combustion plant to the emission ceilings.

(10)

After the final assessment of the TNP notified by the United Kingdom, as amended in accordance with the additional information, the Commission identified one main element not being in compliance with the applicable provisions, as follows:

‘�/p>

for the plant ‘楢berthaw Power Station‘� as the conditions to apply the NOx emission limit value of 1 200 mg/Nm3 for solid fuels used for calculating the plant‘檚 contribution to the 2016 TNP ceiling, which are set out in Note 2 of Table C.1 to Appendix C of the Annex to Implementing Decision 2012/115/EU, are not fulfilled, the Commission considers the application of this emission limit value as not appropriate.

(11)

In addition, the Commission identified 34 plants in the TNP for which the information reported is still inconsistent and/or missing data need to be supplemented, in particular concerning the emission limit values used and the ceiling contributions calculated and reported. The list of plants for which data are inconsistent or missing is included in the Annex to this decision.

(12)

The Commission has therefore come to the conclusion that the TNP notified by the United Kingdom, as amended in accordance with the additional information, is not in accordance with the provisions laid down in Article 32(1), (3) and (4) of Directive 2010/75/EU and in Implementing Decision 2012/115/EU.

(13)

Hence, the TNP notified by the United Kingdom should not be accepted,

HAS ADOPTED THIS DECISION:

Article 1

1. The transitional national plan which the United Kingdom of Great Britain and Northern Ireland notified to the Commission pursuant to Article 32(5) of Directive 2010/75/EU on 14 December 2012, is not in accordance with the requirements laid down in Article 32(1), (3) and (4) of Directive 2010/75/EU and in Implementing Decision 2012/115/EU, and shall, therefore, not be accepted.

2. If the United Kingdom of Great Britain and Northern Ireland intends to implement the transitional national plan, it shall take all necessary measures to address, in a revised version of the plan, the following elements:

(a)

for the plant ‘楢berthaw Power Station‘� which contributes significantly to the overall TNP ceiling for NOx, to correct the emission limit value applied for calculating its contribution to the 2016 ceiling for NOx; in order for the plant to be eligible for using the emission limit value of 1 200 mg/Nm3, the United Kingdom of Great Britain and Northern Ireland shall demonstrate that the average annual volatile content of the solid fuel used in the plant was below 10 % in the reference years considered for the TNP as set out in Note 2 of Table C.1 to Appendix C of the Annex to Implementing Decision 2012/115/EU;

(b)

for the plants listed in the Annex to this decision, to submit the missing data and to correct or clarify all ambiguities in order to obtain full consistency across the information included in, and used for, the transitional national plan; for the purposes of this point, the detailed clarification requests set out in the Commission‘檚 letters sent to the United Kingdom of Great Britain and Northern Ireland on 3 June and 10 September 2013 shall be taken into account.

Article 2

This Decision is addressed to the United Kingdom of Great Britain and Northern Ireland.

Done at Brussels, 12 December 2013.

For the Commission

Janez POTO膶NIK

Member of the Commission


(1) OJ L 334, 17.12.2010, p. 17.

(2) Ares(2012)1500959.

(3) Commission Implementing Decision 2012/115/EU of 10 February 2012 laying down rules concerning the transitional national plans referred to in Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (OJ L 52, 24.2.2012, p. 12).

(4) Directive 2001/80/EC of the European Parliament and of the Council of 23 October 2001 on the limitation of emissions of certain pollutants into air from large combustion plants (OJ L 309, 27.11.2001, p. 1).

(5) Ares(2013)1635147.

(6) Ares(2013)2381277.

(7) Ares(2013)2381361.

(8) Ares(2013)2381402.

(9) Ares(2013)2972980.

(10) Ares(2013)3015778.

(11) Ares(2013)3155496.


ANNEX

LIST OF PLANTS REFERRED TO IN POINT (B) OF ARTICLE 1(2)

Plant number used in the TNP

Plant name

9

Great Coates Works LCP 62

10

Great Coates Works LCP 63

11

Great Coates Works LCP 96

12

Grangemouth Polimeri Europa UK

13

Port of Liverpool CHP ‘�GT

16

Aylesford CHP1

17

Aylesford CHP2

18

Kinneil Stack A1 (B-101)

28

Burghfield Generation Site

37

Cheshire CHP

38

Chickerall Generation Site

44

Wansborough Mill

46

Didcot B Module 6

47

Dow CHP

49

Dalry DSM CHP

58

Ratcliffe on Soar Power Station

68

Grimsby CHP1

71

Hythe CHP1

72

Hythe Package Boilers

73

Indian Queens

81

Keadby Power Station GT3

84

Little Barford Power Station Module 1A

85

Little Barford Power Station Module 1B

99

Sellafield Site Gas Turbine 1

100

Sellafield Site Gas Turbine 2

101

Sellafield Site Gas Turbine 3

102

Sellafield Site Auxiliary Boiler

103

Wilton Power Station

107

Solvay Interox Ltd

120

INEOS Infrastructure (Grangemouth) Ltd Boilers 9 & 10

121

INEOS Infrastructure (Grangemouth) Ltd Boilers 11, 12 & 13

124

Redcar Power Station Boiler

128

Wilton Olefin Boiler

129

North Tees No 1 Aromatics Plant


附件:

P020171219463574952866.pdf

托管标准,您可以接收以下服务:

1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;

2 随时在标准托管页面中查看到该条标准的最新状态;

3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;

4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;

5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;

6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;

进入企业标准托管

您可以通过编辑查新模板,批量查询指定标准集的最新情况。我们会通过查询,向您展示您所查询标准的:

1. 准确的标准号及标准名称(我们通过人工智能技术对您提交的标准号进行自动纠正)

2. 标准的最新状态(现行、废止或未发布)

3. 若标准已废止并被新标准替代,会反馈被替代的标准

4. 若您已托管此标准,便可以实时跟踪这个标准的最新状态

标准查新 模板下载

您可以在这里检索全球超过140万条标准,支持上百个国内国际标准组织的标准查询。您也可以在这里检索国内各类国家、部委和地方的法律法规。

更多标准子库在持续建设中。

标准检索

标准资讯点击排行榜 全部

资讯标题点击

[[ n.title ]] [[ n.read ]]

大连标准化公共服务平台

版权:大连标准化研究院有限公司

地址:大连市中山区高原街56号

电话:0411-82740851

大连标准