委员会决定2008/141/EC,由西班牙执行的对伊扎尔的措施C 47/2003 (ex NN 49/2003)(在文件C(2007) 4298中通报)

技术法规类型:欧盟Eurlex法规 来源:tbtmap

EURLEX ID:32008D0141

OJ编号:OJ L 44, 20.2.2008, p. 33-35

中文标题:委员会决定2008/141/EC,由西班牙执行的对伊扎尔的措施C 47/2003 (ex NN 49/2003)(在文件C(2007) 4298中通报)

原文标题:2008/141/EC: Commission Decision of 25 September 2007 on the measures C 47/2003 (ex NN 49/2003) implemented by Spain for Izar (notified under document number C(2007) 4298) (Text with EEA relevance)

分类:08.60_国家援助与补贴

文件类型:二级立法 Decision|决定

废止日期:2058-12-31

法规全文:查看欧盟官方文件

EUR-Lex - 32008D0141 - EN
| EUROPA > EUR-Lex > ID celex

32008D0141


Title and reference

2008/141/EC: Commission Decision of 25 September 2007 on the measures C 47/2003 (ex NN 49/2003) implemented by Spain for Izar (notified under document number C(2007) 4298) (Text with EEA relevance)

?OJ L 44, 20.2.2008, p. 33–35 (BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

?BG?CS?DA?DE?EL?EN?ES?ET?FI?FR?HU?IT?LT?LV?MT?NL?PL?PT?RO?SK?SL?SV

Text

BG ES CS DA DE ET EL EN FR GA IT LV LT HU MT NL PL PT RO SK SL FI SV
html html html html html html html html html ? html html html html html html html html html html html html html
pdf pdf pdf pdf pdf pdf pdf pdf pdf ? pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf
tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff

Authentic language

  • Spanish

Dates

    of document: 19/12/2007
    of notification: 00/00/0000
    of effect: 00/00/0000; Entry into force Date notif.
    end of validity: 99/99/9999

Classifications

Miscellaneous information

  • Author:
    European Commission
  • Form:
    Decision
  • Addressee:
    Spain
  • Additional information:
    EEA relevance

Relationship between documents

Text

Bilingual display: BG CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT RO SK SL SV

Commission Decision

of 25 September 2007

on the measures C 47/2003 (ex NN 49/2003) implemented by Spain for Izar

(notified under document number C(2007) 4298)

(Only the Spanish text is authentic)

(Text with EEA relevance)

(2008/141/EC)

THE COMMISSION OF THE EUROPEAN COMMUNITIES,

Having regard to the Treaty establishing the European Community, and in particular the first subparagraph of Article 88(2) thereof,

Having regard to the Agreement on the European Economic Area, and in particular Article 62(1)(a) thereof,

Having called on interested parties to submit their comments pursuant to the provisions cited above [1] and having regard to their comments,

Whereas:

I. PROCEDURE

(1) In March 2000, the Commission learnt that three delivery guarantees had been granted by the Spanish public holding company Sociedad Estatal de Participaciones Industriales (SEPI) to Repsol/Gas Natural (Repsol) in relation to the construction and delivery of three LNG tankers contracted to two public shipyards belonging at the time to Astilleros Espa?oles (AESA), and subsequently transferred to the Izar group. AESA and Izar were wholly owned by SEPI.

(2) By letter dated 9 July 2003, the Commission notified Spain of its decision to initiate proceedings under Article 88(2) of the Treaty concerning the three non-notified measures.

(3) By letters dated 5 August 2003 and 22 October 2003, the Spanish authorities submitted their comments on the Commission’s letter. The Commission received comments from one interested party (Repsol) in October 2003 and February 2004. It forwarded them to Spain, which was given the opportunity to react. The comments from Spain were received in letters dated 12 January 2004 and 10 May 2004, respectively.

(4) In the context of two State aid decisions not related to the present procedure [2], adopted during 2004 (i.e. after the opening of the formal investigation concerning the LNG tanker guarantees), the Commission found State aid of EUR 864 million granted to Izar by Spain to be incompatible with the Treaty, and ordered its recovery.

(5) By letter dated 5 August 2004, Spain invoked Article 296 of the Treaty [3] with the objective of rescuing the military shipbuilding activities from a foreseeable bankruptcy of Izar, as a consequence of that recovery order. In subsequent correspondence, the Spanish authorities also explained to the Commission how the new military shipbuilding company formerly known as Bazán (Navantia) would function, outlined their commitments in relation to the competition concerns, and proposed a methodology for the follow-up of those commitments.

(6) In the meanwhile, the pending recovery orders on Izar, for a total of EUR 1,2 billion [4], had led the company to a situation of negative net worth, and technical bankruptcy. In view of this, on 1 April 2005 Spain put into liquidation the civil shipyards that remained in Izar (i.e., shipyards outside the perimeter of the newly created Navantia: Gijón, Sestao, Manises and Seville), and launched a privatisation procedure for those yards.

II. DESCRIPTION OF THE AID MEASURES

(7) In 1999, Repsol awarded three shipowners one contract each for the chartering of one LNG tanker each, plus the option for one extra tanker each, under a long-term time-charter arrangement.

(8) Subsequently, negotiations were undertaken between the shipowners and shipbuilders, including Korean yards, for the construction of the three LNG tankers. On 31 July 2000, two public Spanish shipyards that had just been transferred from AESA to Izar [5] were awarded the three contracts for the construction of the LNG tankers and the final shipbuilding contracts were signed.

(9) On the same day, AESA signed an additional clause to each shipbuilding contract whereby it committed to indemnify Repsol for all the costs Repsol would incur if the ships were not delivered according to the contractual terms for reasons for which the shipyards could be held liable.

(10) On the same day ( 31 July 2000), SEPI granted Repsol delivery guarantees for each of the three shipbuilding contracts, covering the same damages and prejudices for which AESA undertook to indemnify Repsol [6]. The losses were capped to a maximum of approximately EUR 180 million per ship, i.e. for a maximum aggregate total of approximately EUR 540 million. The guarantees were granted for a period starting on 31 July 2000 until the end of the period terminating 12 months after the delivery of each ship [7].

III. REASONS FOR INITIATING THE PROCEDURE

(11) In its decision of 9 July 2003 to initiate the formal investigation procedure (the opening decision), the Commission concluded that the three aid measures constituted State aid within the meaning of Article 87(1) of the Treaty, and questioned their compatibility with the common market. The Commission considered that the beneficiaries of the aid were the yards, but did not exclude the possibility that Repsol could have also benefited from the aid, and decided that the Article 88(2) procedure should include Repsol, in order to allow for the submission of the additional information needed to dispel those doubts.

IV. COMMENTS RECEIVED AFTER THE INITIATION OF FORMAL PROCEEDINGS

(12) In its observations, Repsol insists on the distinction that must be drawn between its position as contractual beneficiary of the guarantees, and any alleged benefits deriving from the state aid. According to Repsol:

- The guarantees from SEPI covered benefits to which Repsol was entitled under Spanish civil and commercial law. The guarantees corresponded to Repsol’s creditor position vis-à-vis the shipowners, Izar and the shipyards. Repsol was not due to pay any premium for the guarantees, as it is not market practice that companies obtaining a security for the respect of contractual obligations must pay for this security.

- In addition, the guarantees did not provide Repsol with any economic advantage within the meaning of Article 87(1) of the Treaty. Similarly to the guarantees received from the shipowner parent companies, SEPI’s counter-guarantees only ensured that the contractual terms of the vessels’ chartering contracts and shipbuilding contracts would be complied with, thereby enabling Repsol to comply with the LNG transportation contracts signed with other parties.

- Repsol would have required additional guarantees to those given by Izar, irrespective of whether they had been granted by SEPI or any other entity. Those guarantees are a requirement in accordance with market practice, in view of the size and risks of the investments and commercial commitments at stake.

(13) The submission from Spain concurred with the above arguments as regards the position of Repsol. The Spanish authorities therefore concluded that Repsol could not be deemed to be a beneficiary of State aid.

V. ASSESSMENT

The position of Repsol as a potential beneficiary of the aid

(14) One of the aims of the opening decision was to identify the beneficiary of any State aid involved in the delivery guarantees granted by SEPI.

(15) The Commission notes that, according to civil law, the provider of a good or service is liable for the performance of the contract signed with the buyer. This liability covers both the quality of the product and the agreed time of delivery. Thus, if a contractual agreement is not respected and the buyer suffers loss or damage as a result, the latter can claim compensation. In the case at hand, this compensation would have been borne by the yard or its parent company Izar.

(16) In view of this, it appears that Repsol, which rented the vessels produced by (yards that are owned by) Izar, was in a creditor position vis-à-vis the shipowners and Izar. Hence, it cannot be held liable under the charter and shipbuilding contracts, including the additional clause thereto.

(17) In consideration of the above, and in accordance with the observations from Repsol and Spain, the Commission concludes that Repsol cannot be regarded as a beneficiary of the aid, since it did not obtain any benefit to which it would not have been entitled on the basis of general civil or commercial law.

Conclusion

(18) The Commission considers that the voluntary liquidation of Izar’s assets was an appropriate measure for the purpose of implementation by Spain of the three pending recovery decisions. In particular, it considers that the commitments and actions undertaken by Spain were sufficient to prevent distortion of competition.

(19) The Commission is also of the opinion that the tendering procedure for the sale of the four civil shipyards was carried out by Spain in a satisfactory manner, through an open, transparent and unconditional procedure. In particular, on 3 November 2006 the Spanish Council of Ministers authorised the sale of the Sestao, Gijón and Seville yards to the successful bidders. The privatisation contracts were signed on 30 November 2006. As regards the remaining yard (Manises), it was concluded that the option which maximised the liquidation value consisted in the closure of the yard, and the transfer of assets to SEPI.

(20) As a result of the liquidation and sale of Izar, the company definitively ceased all economic activity. The sole reason why Izar still exists is so that it can carry out the tasks relating to the cessation of its activities, in particular the termination of employee contracts. Once these tasks have been completed, Izar will be liquidated. These activities are not of a kind to justify applying the competition rules provided for in the Treaty. Consequently, even assuming that the measures in question had entailed a benefit for Izar and a distortion of competition, the Commission considers that any such distortion ceased at the moment when Izar ceased economic activities and closed its yards. Under these circumstances, a Commission decision on the classification of such measures as aid and on their compatibility would not have any practical effect.

(21) Consequently, the formal investigation initiated under Article 88(2) of the Treaty no longer serves any purpose.

VI. CONCLUSION

(22) On the basis of the above considerations, the Commission finds that Repsol cannot be deemed a beneficiary of the disputed aid, and that the procedure against the Izar yards no longer serves any purpose,

HAS ADOPTED THIS DECISION:

Article 1

The formal investigation procedure under Article 88 (2) of the Treaty is closed.

Article 2

This Decision is addressed to Spain.

Done at Brussels, 25 September 2007.

For the Commission

Neelie Kroes

Member of the Commission

[1] OJ C 209, 4.7.2003, p. 24.

[2] Cases C 38/2003 and C 40/2000.

[3] This Article allows a Member State to "take such measures as it considers necessary for the protection of the essential interests of its security which are connected with the production of or trade in arms, munitions and war materials".

[4] In addition to the two 2004 decisions, an older decision from 1999 (Case C 3/99) also requested from Izar recovery of a further EUR 111 million.

[5] On 20 July 2000, AESA sold to Izar the two shipyards responsible for the construction of the LNG tankers. By letter dated 13 February 2003, the Spanish authorities confirmed that Izar had taken over responsibility for AESA’s commitments in relation to the shipbuilding contracts.

[6] Under the terms of the guarantee, SEPI would indemnify Repsol at first request for all the direct and indirect costs and consequent losses Repsol would incur if the ships were not delivered according to the contract terms for reasons for which Izar could be held liable.

[7] Pursuant to the shipbuilding contracts, the vessels had to be delivered on 15 September 2003, 15 December 2003 and 15 March 2004, respectively.

--------------------------------------------------

Top

托管标准,您可以接收以下服务:

1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;

2 随时在标准托管页面中查看到该条标准的最新状态;

3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;

4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;

5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;

6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;

进入企业标准托管

您可以通过编辑查新模板,批量查询指定标准集的最新情况。我们会通过查询,向您展示您所查询标准的:

1. 准确的标准号及标准名称(我们通过人工智能技术对您提交的标准号进行自动纠正)

2. 标准的最新状态(现行、废止或未发布)

3. 若标准已废止并被新标准替代,会反馈被替代的标准

4. 若您已托管此标准,便可以实时跟踪这个标准的最新状态

标准查新 模板下载

您可以在这里检索全球超过140万条标准,支持上百个国内国际标准组织的标准查询。您也可以在这里检索国内各类国家、部委和地方的法律法规。

更多标准子库在持续建设中。

标准检索

标准资讯点击排行榜 全部

资讯标题点击

[[ n.title ]] [[ n.read ]]

大连标准化公共服务平台

版权:大连标准化研究院有限公司

地址:大连市中山区高原街56号

电话:0411-82740851

大连标准