委员会决定2009/360/EC,完成关于管理来自榨取业废物的欧洲议会和理事会指令2006/21/EC制定的废物特征的技术需求(根据文件C(2009) 3013通报)

技术法规类型:欧盟Eurlex法规 来源:tbtmap

EURLEX ID:32009D0360

OJ编号:OJ L 110, 1.5.2009, p. 48-51

中文标题:委员会决定2009/360/EC,完成关于管理来自榨取业废物的欧洲议会和理事会指令2006/21/EC制定的废物特征的技术需求(根据文件C(2009) 3013通报)

原文标题:2009/360/EC: Commission Decision of 30 April 2009 completing the technical requirements for waste characterisation laid down by Directive 2006/21/EC of the European Parliament and of the Council on the management of waste from extractive industries (notified under document number C(2009) 3013)

分类:15.10.30.30_废物管理与清洁技术

文件类型:二级立法 Decision|决定

废止日期:2058-12-31

法规全文:查看欧盟官方文件

EUR-Lex - 32009D0360 - EN
?

32009D0360


Title and reference

2009/360/EC: Commission Decision of 30?April 2009 completing the technical requirements for waste characterisation laid down by Directive 2006/21/EC of the European Parliament and of the Council on the management of waste from extractive industries (notified under document number C(2009) 3013)

?OJ L 110, 1.5.2009, p. 48–51 (BG, ES, CS, DA, DE, ET, EL, EN, FR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

?BG?CS?DA?DE?EL?EN?ES?ET?FI?FR?HU?IT?LT?LV?MT?NL?PL?PT?RO?SK?SL?SV

Text

BG ES CS DA DE ET EL EN FR GA IT LV LT HU MT NL PL PT RO SK SL FI SV
html html html html html html html html html ? html html html html html html html html html html html html html
pdf pdf pdf pdf pdf pdf pdf pdf pdf ? pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf pdf
tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff tiff

Dates

    of document: 30/04/2009
    of notification: 00/00/0000
    of effect: 00/00/0000; Entry into force Date notif.
    end of validity: 99/99/9999

Classifications

Miscellaneous information

  • Author:
    European Commission
  • Form:
    Decision
  • Addressee:
    Member States of the Community

Relationship between documents

Text

Bilingual display: BG CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT RO SK SL SV

Commission Decision

of 30 April 2009

completing the technical requirements for waste characterisation laid down by Directive 2006/21/EC of the European Parliament and of the Council on the management of waste from extractive industries

(notified under document number C(2009) 3013)

(2009/360/EC)

THE COMMISSION OF THE EUROPEAN COMMUNITIES,

Having regard to the Treaty establishing the European Community,

Having regard to Directive 2006/21/EC of the European Parliament and of the Council of 15 March 2006 on the management of waste from extractive industries and amending Directive 2004/35/EC [1], and in particular Article 22(1)(e) thereof,

Whereas:

(1) Directive 2006/21/EC provides for waste characterisation as part of the waste management plan, which has to be drawn up by the operator of extractive industries and approved by the competent authority. Annex II of that Directive provides a list of certain aspects to be included in the waste characterisation.

(2) The purpose of the characterisation of extractive waste is to obtain the relevant information on the waste to be managed in order to be able to assess and monitor its properties, behaviour and characteristics and thereby ensure that it is managed under environmentally safe conditions in the long term. Furthermore, the characterisation of extractive waste should facilitate the determination of the options for managing such waste and the related mitigation measures in order to protect human health and the environment.

(3) The necessary information and data for the characterisation of extractive waste should be collected on the basis of existing relevant and appropriate information or, if needed, by sampling and testing. It should be ensured that information and data for waste characterisation are appropriate, of adequate quality and representative of the waste. This information should be duly justified in the waste management plan to the full satisfaction of the competent authority.

(4) The level of detail of information to be gathered and the related sampling or testing needs should be adapted to the type of waste, the potential environmental risks, and the intended waste facility. From a technical point of view, it should be made possible to adopt an iterative approach to ensure appropriate waste characterisation.

(5) From a technical point of view, it is appropriate to exempt waste defined as inert in accordance with the criteria laid down in Commission Decision 2009/359/EC [2] from part of the geochemical testing.

(6) The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 18 of Directive 2006/12/EC of the European Parliament and of the Council [3],

HAS ADOPTED THIS DECISION:

Article 1

Waste characterisation

1. Member States shall ensure that the waste characterisation to be carried out by operators in the extractive industries complies with this Decision.

2. Waste characterisation shall cover the following categories of information as specified in the Annex:

(a) background information;

(b) geological background of deposit to be exploited;

(c) nature of the waste and its intended handling;

(d) geotechnical behaviour of the waste;

(e) geochemical characteristics and behaviour of the waste.

3. The criteria for defining inert waste laid down in Decision 2009/359/EC shall be taken into account for the purpose of assessing the geochemical behaviour of waste. Where, on the basis of those criteria, waste is considered to be "inert", it shall be only subject to the relevant part of geochemical testing referred to in point 5 of the Annex.

Article 2

Collection and evaluation of information

1. Information and data necessary for the waste characterisation shall be collected in the order set out in paragraphs 2 to 5.

2. Existing investigations and studies, including existing permits, geological surveys, similar sites, lists of inert waste, appropriate certification schemes, European or national standards for similar material, which satisfy the technical requirements set out in the Annex shall be used.

3. The quality and representativity of all information shall be evaluated and possible missing information shall be identified.

4. Where information necessary for the characterisation of the waste is missing, a sampling plan shall be drawn up in accordance with standard EN 14899 and samples shall be taken in accordance with that sampling plan. Sampling plans shall be based on identified information as necessary, including:

(a) purpose of data collection,

(b) testing programme and sampling requirements,

(c) sampling situations, including sampling from drill-cores, excavation face, conveyor belt, heap, pond, or other relevant situation,

(d) procedures and recommendations for sample numbers, size, mass, description and handling.

The reliability and quality of the sampling results shall be evaluated.

5. The results of the characterisation process shall be evaluated. Where necessary, additional information shall be collected following the same methodology. The final result shall feed into the waste management plan.

Article 3

This Decision is addressed to the Member States.

Done at Brussels, 30 April 2009.

For the Commission

Stavros Dimas

Member of the Commission

[1] OJ L 102, 11.4.2006, p. 15.

[2] See page 46 of this Official Journal.

[3] OJ L 114, 27.4.2006, p. 9.

--------------------------------------------------

ANNEX

TECHNICAL REQUIREMENTS FOR WASTE CHARACTERISATION

1. Background information

Review and understanding of the general background and objectives of the extractive operation.

Collection of general information about:

- prospecting, extraction, or processing activity,

- type and description of method of extraction and process applied,

- nature of the intended product.

2. Geological background of deposit to be exploited

Identification of the waste units to be exposed by extraction and processing by providing relevant information on:

- nature of surrounding rocks, their chemistry and mineralogy, including hydrothermal alteration of mineralised rocks and barren rocks,

- nature of deposit, including mineralised rocks or rock-bearing mineralisation,

- mineralisation typology, their chemistry and mineralogy, including physical properties such as density, porosity, particle size distribution, water content, covering worked minerals, gangue minerals, hydrothermal newly-formed minerals,

- size and geometry of deposit,

- weathering and supergene alteration from the chemical and mineralogical point of view.

3. The waste and its intended handling

Description of the nature of all the wastes occurring in each prospecting, extraction and processing operation, including overburden, waste rock and tailings, by providing information on the following elements:

- origin of the waste in the extraction site and the process generating that waste such as prospecting, extraction, milling, concentration,

- quantity of the waste,

- description of the waste transport system,

- description of the chemical substances to be used during treatment,

- classification of the waste according to Commission decision 2000/532/EC [1], including hazardous properties,

- type of intended waste facility, final form of exposure of the waste and method of deposition of the waste into the facility.

4. Geotechnical behaviour of waste

Identification of the suitable parameters for assessing the intrinsic physical characteristics of the waste taking into account the type of waste facility.

Relevant parameters to be considered are: granulometry, plasticity, density and water content, degree of compaction, shear strength and angle of friction, permeability and void ratio, compressibility and consolidation.

5. Geochemical characteristics and behaviour of the waste

Specification of the chemical and mineralogical characteristics of the waste, and of any additives or residuals remaining in the waste.

Prediction of drainage chemistry over time for each type of waste, taking into account its intended handling, in particular:

- evaluation of metals, oxyanion and salt leachability over time by pH dependence leaching test, and/or percolation test and/or time-dependent release and/or other suitable testing,

- for sulphide-containing waste, static or kinetic tests shall be carried out in order to determine acid-rock drainage and metal leaching over time.

[1] OJ L 226, 6.9.2000, p. 3.

--------------------------------------------------

Top

托管标准,您可以接收以下服务:

1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;

2 随时在标准托管页面中查看到该条标准的最新状态;

3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;

4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;

5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;

6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;

进入企业标准托管

您可以通过编辑查新模板,批量查询指定标准集的最新情况。我们会通过查询,向您展示您所查询标准的:

1. 准确的标准号及标准名称(我们通过人工智能技术对您提交的标准号进行自动纠正)

2. 标准的最新状态(现行、废止或未发布)

3. 若标准已废止并被新标准替代,会反馈被替代的标准

4. 若您已托管此标准,便可以实时跟踪这个标准的最新状态

标准查新 模板下载

您可以在这里检索全球超过140万条标准,支持上百个国内国际标准组织的标准查询。您也可以在这里检索国内各类国家、部委和地方的法律法规。

更多标准子库在持续建设中。

标准检索

标准资讯点击排行榜 全部

资讯标题点击

[[ n.title ]] [[ n.read ]]

大连标准化公共服务平台

版权:大连标准化研究院有限公司

地址:大连市中山区高原街56号

电话:0411-82740851

大连标准