委员会条例 (EC) No 2386/96,,实施关于通报委员会在欧共体的石油、天然气和电力产业的相关投资项目的理事会条例 (EC) No 736/96(内容与EEA相关)
技术法规类型:欧盟Eurlex法规 来源:tbtmap
EURLEX ID:31996R2386
OJ编号:OJ L 326, 17.12.1996, p. 13-20
中文标题:委员会条例 (EC) No 2386/96,,实施关于通报委员会在欧共体的石油、天然气和电力产业的相关投资项目的理事会条例 (EC) No 736/96(内容与EEA相关)
原文标题:Commission Regulation (EC) No 2386/96 of 16 December 1996 applying Council Regulation (EC) No 736/96 of 22 April 1996 on notifying the Commission of investment projects of interest to the Community in the petroleum, natural gas and electricity sectors (Text with EEA relevance)
分类:12.10.10_总则
文件类型:二级立法 Regulation|条例
生效日期:1996-12-18
废止日期:2010-10-11
法规全文:查看欧盟官方文件
31996R2386
Title and reference
Commission Regulation (EC) No 2386/96 of 16 December 1996 applying Council Regulation (EC) No 736/96 of 22 April 1996 on notifying the Commission of investment projects of interest to the Community in the petroleum, natural gas and electricity sectors (Text with EEA relevance)
?OJ L 326, 17.12.1996, p. 13–20 (ES, DA, DE, EL, EN, FR, IT, NL, PT, FI, SV)
?Special edition in Czech: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Estonian: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Hungarian Chapter 12 Volume 01 P. 313 - 320
?Special edition in Lithuanian: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Latvian: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Maltese: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Polish: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Slovakian: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Slovenian: Chapter 12 Volume 01 P. 313 - 320
?Special edition in Bulgarian: Chapter 12 Volume 01 P. 235 - 242
?Special edition in Romanian: Chapter 12 Volume 01 P. 235 - 242
Text
| BG | ES | CS | DA | DE | ET | EL | EN | FR | GA | IT | LV | LT | HU | MT | NL | PL | PT | RO | SK | SL | FI | SV |
| html | html | html | html | html | html | html | html | html | ? | html | html | html | html | html | html | html | html | html | html | html | html | html |
| ? | ? | ? | ? | ? | ? | ? | ? | ? | ? | ? | ? | |||||||||||
| tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff | tiff |
Dates
- of document: 16/12/1996
of effect: 18/12/1996; Entry into force Date pub. + 1 See Art 2
end of validity: 11/10/2010
Classifications
- EUROVOC descriptor:
electrical energy
form
information transfer
investment project
natural gas
petroleum - Directory code:
12.10.10.00 Energy / General principles and programmes / General
- Subject matter:
Energy, Investments, Information and verification
Miscellaneous information
- Author:
European Commission - Form:
Regulation - Additional information:
EEA relevance
Relationship between documents
- Treaty:
European Community - Legal basis:
11992E213
31996R0736 -A02P2
- Select all documents based on this document
- Amendment to:
31996R0736 Implementation Implementation Article 2.2 from 18/12/1996
- Amended by:
Repealed by 32010R0833
- Select all documents mentioning this document
Text
| Bilingual display: BG CS DA DE EL EN ES ET FI FR HU IT LT LV MT NL PL PT RO SK SL SV |
COMMISSION REGULATION (EC) No 2386/96 of 16 December 1996 applying Council Regulation (EC) No 736/96 of 22 April 1996 on notifying the Commission of investment projects of interest to the Community in the petroleum, natural gas and electricity sectors (Text with EEA relevance)
THE COMMISSION OF THE EUROPEAN COMMUNITIES,
Having regard to the Treaty establishing the European Community and in particular Article 213 thereof,
Having regard to Council Regulation (EC) No 736/96 of 22 April 1996 on notifying the Commission of investment projects of interest to the Community in petroleum, natural gas and electricity sectors (1), and in particular Article 2.2 thereof,
Whereas Article 2.2 of Regulation (EC) No 736/96 provides that the Commission may, within the limits laid down by that Regulation and the annexes thereto, adopt implementing provisions concerning the form, content and other details of the notifications provided for in Article 1 thereof,
Whereas to simplify, on a technical level, the information system and to gather comparable data, notifications to be made by Member States and, in certain cases undertakings, should be standardized by the use of questionnaires which would serve as a guide for the presentation and content of such notifications,
HAS ADOPTED THIS REGULATION:
Article 1
The notifications referred to in Article 1 of Regulation (EC) No 736/96 shall be drawn up as shown in the annex hereto.
Article 2
This Regulation shall enter into force on the day following its publication in the Official Journal of the European Communities.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 16 December 1996.
For the Commission
Christos PAPOUTSIS
Member of the Commission
(1) OJ No L 102, 25. 4. 1996, p. 1.
ANNEX
Questionnaires
on information to be submitted:
(a) by companies to the Governments of the Member States, except where the Member States have decided to use other means of gathering the information on the basis of Article 1, second paragraph, last sentence of Regulation (EC) No 736/96;
(b) by the Member States to the Commission of the European Communities.
The questionnaires forming part of this annex shall serve as a guide to enable the form and content of the Communications to be standardized. The Communications shall refer to the following:
- existing installations or parts of installations,
- installations or parts of installations under construction or at the planning stage,
- proposed withdrawals from service of installations or parts of installations.
Under 'existing installations or parts of installations` shall be included as separately specified the total capacity in service at the reporting date.
The following shall be considered as 'installations or parts of installations at the planning stage`: investment projects within the meaning of Regulation (EC) No 736/96 for which the decision in principle to construct or enlarge an installation or part of an installation has been taken and on which work is scheduled to start within three years from the reference date, in the case of investment projects in the petroleum and natural gas sectors, or within five years in the case of investment projects in the electricity sector. This shall include those investment projects of which the major features may, in whole or in part, be subject to future review or to final authorization by a competent authority.
The following shall be considered as 'proposed withdrawals from service of installations or parts of installations`: installations or parts of installations with respect to which the decision has been taken in principle to withdraw them from service, this decision normally being expected to be put into effect within three years from the reference date, in the case of investment projects in the electricity and natural gas sector, or within one year in the case of investment projects in the petroleum sector.
The 'supplementary information` relating to investment projects shall include significant changes in the major features and decisional status of projects since the previous communication, and such other specific comments indicated by footnotes on the relevant questionnaire sheet. In addition Member States shall add any comments they may have relating to the projects.
All information collected shall be treated confidentially.
>START OF GRAPHIC>
G1 - INVESTMENT IN GAS PIPELINES Member State: Position at 1 January . . . .
Capacity (A) Additions (B) Additions (C) Withdrawals (D)
>END OF GRAPHIC>
>START OF GRAPHIC>
G2 - INVESTMENT IN LNG PLANTS Member State: Position at 1 January . . . .
Capacity (A) Additions (B) Additions (C) Withdrawals (D)
>END OF GRAPHIC>
>START OF GRAPHIC>
G3 - INVESTMENTS IN STORAGE CAPACITY Member State: Position at 1 January . . . .
Capacity (A) Additions (B) Additions (C) Withdrawals (D)
>END OF GRAPHIC>
>START OF GRAPHIC>
REFINERY INSTALLATION CAPACITIES
(in thousand tonnes per year) Member State: Position at 1 January . . . .
Capacity (A) Additions (B1) Additions (B2) Withdrawals (C) Remarks
Atmospheric Distillation
Vacuum Distillation
Cracking (Thermal)
- Visbreaking and/or Thermal Cracking
- Coking
- Other
Cracking (Catalytic)
- Luid Catalytic Cracking
- Hydrocracking
- Other
Reforming
Naphtha Isomerisation
Desulphurisation
- Gasoil
- HFO
- Other
Alkylation
Polymerisation
Isomerisation (C4)
Etherification
- MTBE, TAME
- ETBE
- Other
(A) Position at 1 January of current calender year of total capacity in service: the aggregate capacity of individual plants which are in regular operation including plants shut down for maintenance or repairs. It is thus equal to 'total (installed) capacity` less capacity which has been withdrawn from service indefinitely, or for an extended period.
(B1) Capacity expected to come 'on stream` in the course of the current calendar year.
(B2) Capacity expected to come 'on stream` in the course of the two following calendar years.
New or re-commissioned capacity: the capacity of plant which is:
(a) newly commissioned;
(b) converted from other uses;
(c) brought back into service after being withdrawn due to surplus requirements.
(C) Capacity expected to come 'off stream` in the course of the current calendar year.
(a) 'Finally`: the capacity of plant which is scheduled to be withdrawn from service either to be scrapped or to be converted permanently to other uses;
(b) 'Temporarily`: the capacity of plant which is scheduled to be withdrawn due to surplus to current requirements but which is firmly expected to be eventually put back into service.>END OF GRAPHIC>
>START OF GRAPHIC>
INVESTMENTS IN ELECTRICITY SECTOR PRODUCTION E1
MEMBER STATE: Situation on 1 January . . . . Number of installations and nominal power (MW) Supplementary information
Type of installation Capacity (A1) Capacity (A2) Additional capacity (B1) Additional capacity (B2) Withdrawal (C)
>END OF GRAPHIC>
>START OF GRAPHIC>
INVESTMENTS IN ELECTRICITY SECTOR TRANSPORT E2
MEMBER STATE: Situation on 1 January . . . . Number of installations and length (km) Supplementary information
Type of installation Capacity (A1) Capacity (A2) Additional Capacity (B1) Additional Capacity (B2) Withdrawal (C)
>END OF GRAPHIC>
| Top |
托管标准,您可以接收以下服务:
1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;
2 随时在标准托管页面中查看到该条标准的最新状态;
3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;
4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;
5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;
6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;
标准资讯点击排行榜 全部
资讯标题点击
[[ n.title ]] [[ n.read ]]大连标准化公共服务平台
版权:大连标准化研究院有限公司
地址:大连市中山区高原街56号
电话:0411-82740851