委员会决定94/417/EC,批准聚合财政手段援助关于西班牙No CF: 93/11/61/002/029 (Caudal、Lena和Nalón rivers)废水处理的一套方案(仅西班牙语版本有效)

技术法规类型:欧盟Eurlex法规 来源:tbtmap

EURLEX ID:31994D0417

OJ编号:OJ L 185, 20.7.1994, p. 197-205

中文标题:委员会决定94/417/EC,批准聚合财政手段援助关于西班牙No CF: 93/11/61/002/029 (Caudal、Lena和Nalón rivers)废水处理的一套方案(仅西班牙语版本有效)

原文标题:94/417/EC: Commission Decision of 16 December 1993 concerning the grant of assistance from the cohesion financial instrument to a set of projects concerning the treatment of waste water (Caudal, Lena and Nalón rivers) in Spain No CF: 93/11/61/002/029 (Only the Spanish text is authentic)

分类:14.50_结构文书的协调

文件类型:二级立法 Decision|决定

生效日期:1993-12-22

废止日期:2058-12-31

法规全文:查看欧盟官方文件

EUR-Lex - 31994D0417 - EN
| EUROPA > EUR-Lex > ID celex

31994D0417


Title and reference

94/417/EC: Commission Decision of 16 December 1993 concerning the grant of assistance from the cohesion financial instrument to a set of projects concerning the treatment of waste water (Caudal, Lena and Nal贸n rivers) in Spain No CF: 93/11/61/002/029 (Only the Spanish text is authentic)

Official Journal L 185 , 20/07/1994 P. 0197 - 0205

DA DE EL EN ES FR IT NL PT

Text

BG ES CS DA DE ET EL EN FR GA IT LV LT HU MT NL PL PT RO SK SL FI SV
html html html html html html html html html
tiff tiff tiff tiff tiff tiff tiff tiff tiff

Authentic language

  • Spanish

Dates

    of document: 16/12/1993
    of notification: 22/12/1993
    of effect: 22/12/1993; Entry into force Date notif.
    end of validity: 99/99/9999

Classifications

Miscellaneous information

  • Author:
    European Commission
  • Form:
    Decision
  • Addressee:
    Spain

Relationship between documents

Text

Bilingual display: DA DE EL EN ES FR IT NL PT

COMMISSION DECISION of 16 December 1993 concerning the grant of assistance from the cohesion financial instrument to a set of projects concerning the treatment of waste water (Caudal, Lena and Nal贸n rivers) in Spain No CF: 93/11/61/002/029 (Only the Spanish text is authentic) (94/417/EC)

THE COMMISSION OF THE EUROPEAN COMMUNITIES,

Having regard to the Treaty establishing the European Community,

Having regard to Council Regulation (EEC) No 792/93 of 30 March 1993 establishing a cohesion financial instrument (1), and in particular Article 8 (6) thereof,

Whereas Article 1 of Regulation (EEC) No 792/93 establishes a cohesion financial instrument to provide Community support for projects in the fields of the environment and trans-European transport infrastructure networks;

Whereas pursuant to Article 9 of Regulation (EEC) No 792/93 certain provisions of Titles VI and VII of Council Regulation (EEC) No 4253/88 of 19 December 1988 concerning the provisions for implementing Regulation (EEC) No 2052/88 as regards coordination of the activities of the different Structural Funds between themselves and with the operations of the European Investment Bank and the other existing financial instruments (2), as amended by Regulation (EEC) No 2082/93 (3), are to apply mutatis mutandis;

Whereas Article 2 of Regulation (EEC) No 792/93 defines the types of measure for which the cohesion financial instrument may provide assistance;

Whereas Article 10 of Regulation (EEC) No 792/93 requires the Member States to ensure that adequate publicity is given to the operations of the financial instrument and that the measures which are described in Annex V to this Decision are undertaken;

Whereas references to 'project' shall be understood to mean also 'set of projects';

Whereas on 12 and 17 May 1993 the Spanish Government submitted an application for assistance from the cohesion financial instrument for a set of projects concerning the treatment of waste water (Caudal, Lena and Nal贸n rivers);

Whereas that application concerns a project which is eligible under the terms of Article 2 of Regulation (EEC) No 792/93;

Whereas the application for assistance contains all the information required by Article 8 (4) of Regulation (EEC) No 792/93 and satisfies the criteria set out in Article 8 (3) and (5) of the Regulation;

Whereas the project will help achieve the objectives of Article 130 r of the Treaty concerning the environment;

Whereas the project is the result of measures taken in accordance with Article 130 s of the Treaty;

Whereas Article 1 of the Financial Regulation of 21 December 1977 applicable to the general budget of the European Communities (4), as last amended by Regulation (Euratom, ECSC, EEC) No 610/90 (5), states that the legal commitments entered into for measures extending over more than one financial year shall contain a time limit for implementation which must be specified to the recipient in due form when the aid is granted;

Whereas pursuant to Article 9 of Regulation (EEC) No 792/93, the Commission and the Member State will ensure that there is evaluation and systematic monitoring of the project;

Whereas the financial implementation provisions, monitoring and assessment are specified in Annexes III and IV to this Decision; whereas failure to comply with those provisions may result in suspension or reduction of the assistance granted pursuant to

Article 9

(3) of Regulation (EEC) No 792/93 and the provisions contained in Annex VI;

Whereas all the other conditions laid down have been complied with,

HAS ADOPTED THIS DECISION:

Article 1

1. The set of projects concerning the treatment of waste water (Caudal, Lena and Nal贸n rivers) situated in Spain as described in Annex I hereto is hereby approved for the period from 1 April 1993 to 31 October 1994.

2. References to 'project' in the present Decision and Annexes shall be understood to mean also 'set of projects'.

Article 2

1. The maximum eligible expenditure to be taken as the basis for this Decision shall be ECU 3 698 276.

2. The rate of Community assistance granted to the project shall be fixed at 85 %.

3. The maximum amount of the contribution from the cohesion financial instrument shall be fixed at ECU 3 143 534.

4. The contribution is committed from the 1993 budget.

Article 3

1. Community assistance shall be based on the financial plan for the project set out in Annex II.

2. Commitments and payments of Community assistance granted to the project shall be made in accordance with Article 9 of Regulation (EEC) No 792/93 and as specified in Annex III.

3. The amount of the first advance payment shall be fixed at ECU 1 761 291.

Article 4

1. Community assistance shall cover expenditure on the project for which legally binding arrangements have been made in Spain and for which the requisite finance has been specifically allocated to works to be completed not later than 31 December 1994.

2. Expenditure incurred before 1 October 1993 shall not be eligible for assistance.

3. The closing date for the completion of national payments on the project is fixed not later than 12 months after the date mentioned in subparagraph 1.

Article 5

1. The project shall be carried out in accordance with Community policies, and in particular with Articles 7, 30, 52 and 59 of the Treaty, as well as with Community law, in particular with the Directives coordinating public procurement procedures.

2. This Decision shall not prejudice the right of the Commission to commence infringement proceedings pursuant to Article 169 of the Treaty.

Article 6

Systematic monitoring and assessment of the project shall take place in accordance with the provisions set out in Annex IV hereto.

Article 7

The Member State concerned shall ensure adequate publicity for the project as specified in Annex V.

Article 8

Each Annex to this Decision shall form an integral part of it.

Article 9

Failure to comply with the provisions of this Decision may entail a reduction or suspension of assistance in accordance with the provisions set out in Annex VI.

Article 10

This Decision is addressed to Spain.

Done at Brussels, 16 December 1993.

For the Commission

Peter SCHMIDHUBER

Member of the Commission

(1) OJ No L 79, 1. 4. 1993, p. 74.(2) OJ No L 374, 31. 12. 1988, p. 1.(3) OJ No L 193, 31. 7. 1993, p. 20.(4) OJ No L 356, 31. 12. 1977, p. 1.(5) OJ No L 70, 16. 3. 1990, p. 1.

ANNEX I

COHESION FINANCIAL INSTRUMENT 1. Project title

Treatment of waste water - Caudal, Lena and Nal贸n rivers

2. Authority making the application

2.1. Name: Direcci贸n General de Planificaci贸n

2.2. Address: Paseo de la Castellana, 162 - 28071 Madrid

3. Authority responsible for implementation

3.1. Name: Direcci贸n General de Calidad de las Aguas

3.2. Address: Paseo de la Castellana, 67 - 28071 Madrid

4. Location

4.1. Member State: Spain

4.2. Region: Asturias

5. Brief description

The work consists of:

Caudal and Lena rivers:

- laying of 1 110 m of pipeline between Ujo and Sovilla,

- laying of 4 700 m of pipeline between Sovilla and Pola de Lena,

- 1 000 m of subsidiary drain to transport waste water from Villallana and Pola de Lena to the contour channel,

- ancillary work needed for the proper functioning and use of the system.

Nal贸n river:

- laying of 1 750 m of pipeline between Barredos and Pola de Laviana,

- 1 580 m of subsidiary drain to transport waste water from Barredos and Pola de Laviana to the contour channel,

- ancillary work.

6. Principal objectives

To complete the installation of the pipeline from the Caudal river to the community of Sovilla, contaminated by industrial and domestic waste.

To complete the contour channel for the Lena river, the section in question being seriously contaminated by industrial and domestic waste.

To complete the installation of the pipeline from the Nal贸n to the community of Pola de Laviana.

7. Work schedule

Date of commencement: 1 April 1993

Date of completion: 31 October 1994

8. Socio-economic analysis

The benefits of the projects are:

- a cleaner environment by collecting the waste water of 30 000 inhabitants and transporting it to treatment plants,

- recovery of fish life, particularly salmonids,

- exploitation of the rivers for sports and recreation,

- improved value of the surrounding land,

- development of tourism as a result of improved environmental conditions.

9. Contribution to environmental policy

Compliance with Council Directive 91/271/EEC (1) urban waste water.

10. Cost

"(ECU '000) (2) "" ID="1">Total cost: > ID="2">3 698,28 "> ID="1">Total eligible cost: > ID="2">3 698,28 "> ID="1">Total assistance applied for from the cohesion financial instrument: > ID="2">3 143,53 "">

(1) ECU 1 = Pta 154,207.

ANNEX II

FINANCING PLAN

"Project: 93/11/61/002/029 "(ECU '000) >Year (1)""> ID="1">3 108,160 > ID="2">3 108,160 > ID="3">100 > ID="4">2 641,936 > ID="5">85 > ID="6">466,224 > ID="7">15 "> ID="1">590,116 > ID="2">590,116 > ID="3">100 > ID="4">501,599 > ID="5">85 > ID="6">88,517 > ID="7">15 "> ID="1""" ID="1">3 698,276 > ID="2">3 698,276 > ID="3">100 > ID="4">3 143,535 > ID="5">85 > ID="6">554,741 > ID="7">15 "">

(1) Total eligible cost of project.(2) OJ No L 135, 30. 5. 1991, p. 40.

ANNEX III

FINANCIAL IMPLEMENTING PROVISIONS 1. The financial provisions referred to in Article 9 of Regulation (EEC) No 792/93 shall be implemented as follows:

Community assistance

2. Community assistance shall be expressed as a percentage of eligible expenditure. If the actual expenditure incurred differs from the expenditure initially planned, the Community assistance granted shall be varied to take account of this but may not exceed the maximum amount stated in the Decision. A change of the rate of Community assistance or of the maximum amount of the grant will require a modification of the Decision according to the procedures described in point 12.

Commitments and payments

3. The Member State shall undertake to ensure that, for the project to which this Decision relates, all public or private bodies involved in the management and implementation of these operations maintain either a separate accounting system or an adequate accounting codification of all transactions concerned which will facilitate the verification of expenditure by the Community and national control authorities.

4. Budgetary commitments and payments shall be made in accordance with Article 9 (4), (5) and (6) of Regulation (EEC) No 792/93.

5. All payments of aid granted by the Commission under this Decision shall be made to the authority designated by the Member State, which shall also be responsible for refunding any overpaid amounts to the Commission. Payments shall be made to a single bank account designated by the Member State. As a general rule, the Commission shall make payments no later than two months after receipt of a valid application.

6. The Member State shall ensure that applications for payment and statements of expenditure actually incurred comply with the financing plan, including the schedule of expenditure, annexed to this Decision, as amended where appropriate, following the procedures laid down in points 12 and 13.

7. In accordance with Article 22 of Regulation (EEC) No 4253/88, all commitments and payments shall be in ecus.

8. Statements of expenditure in support of applications for payment shall be denominated in ecus or in national currency.

9. Member States which submit statements of expenditure in ecus shall convert the amounts of expenditure incurred in national currency into ecus using the rate for the month during which the expenditure was booked in the accounts of the authorities responsible for the financial management of projects. Each month the Commission shall inform the Member States of the rate to be used for that purpose.

10. Statements of expenditure in national currency shall be converted into ecus at the rate for the month when they were received by the Commission.

Recovery of undue payments

11. Any sum wrongly paid shall be repaid to the Commission by the authority designated in point 5. Interest on account of late payments shall be charged on sums not repaid in accordance with Article 24 (3) of Regulation (EEC) No 4253/88. If the authority does not repay the amount due to the Community, the Member State shall refund this amount to the Commission.

Procedure for amending the project Decision

12. Any amendments to the Decision shall be made in accordance with the following procedures:

(a) Amendments which entail a substantial change in the objectives or characteristics of the project, an increase or reduction in the rate of financing applied or the maximum amount of assistance or a substantial change in the financing plan or schedule of expenditure shall be made by means of a Commission decision taken in response to a request by the Member State or on the initiative of the Commission, after consultation with the Member State;

(b) In the case of other amendments, the Member State shall send the Commission a proposal for amendment. The Commission shall make its comments or signify its agreement within 20 working days of receipt of the proposal. The amendments shall be adopted when the Commission has given its agreement.

13. Any change in annual expenditure of less than 10 % of the total expenditure planned for the project shall not be regarded as a substantial change of the financing plan and the schedule of expenditure.

Procedure for closing a project

14. The time limits for complying with the legal obligations contracted under this Decision shall be complied with and payments made in accordance with Article 4 of the Decision. These may be amended before they expire in accordance with the procedure in point 12 (b) provided that the extension does not exceed one year. For that purpose, the Member State shall send the Commission a proposal for amendment together with information justifying the amendment. Where the extension exceeds one year, the procedure in point 12 (a) shall apply.

15. If the time limit is not extended, any expenditure incurred after the dates indicated in Article 4 of the Decision shall not be eligible for assistance from the financial instrument.

ANNEX IV

MONITORING AND ASSESSMENT 1. The national body responsible for implementation shall be fully involved in the monitoring and assessment of projects. In order to carry out these obligations, the Member States may request a Community contribution from the Commission as technical support.

A. Monitoring

2. Monitoring means a system of information on the progress made in implementing the project. Monitoring shall use financial and, where appropriate, physical indicators which enable actual progress on completion of the project to be compared with the financing plan in Annex II and the schedule for implementation in Annex I.

3. The implementation of projects shall be monitored by means of:

- the Monitoring Committee set up by each Member State concerned,

- reports,

- sample checks.

Monitoring Committee

4. The Monitoring Committee set up to monitor projects financed by the cohesion financial instrument in Spain shall be responsible for monitoring the project which is the subject of this Decision. The Committee shall review its implementation at regular intervals and, where necessary, propose any adjustments required.

The composition of the Monitoring Committee, including appointment of its chairman, its operation and frequency of meetings, shall be adopted by joint agreement between the Member State and the Commission, not later than three months after the approval of the first project in Spain.

5. The Committee shall:

(a) monitor the proper implementation of the project and ensure that it achieves the objectives laid down for it in accordance with the plan originally adopted;

(b) give its opinion on the draft annual reports on implementation referred to in point 6;

(c) propose, when appropriate, the necessary measure to ensure that the project achieves the objectives laid down for it;

(d) ensure publicity for the project;

(e) ensure that Community policies are respected, especially environment policy;

(f) decide by agreement between the Commission and the Member State any additional responsibilities of the Committee.

In general, the documents required for meetings of the Committee shall be available three weeks in advance.

Reports

6. In accordance with Article 25 (4) of Regulation (EEC) No 4253/88, annual reports for each complete year of implementation and a final report shall be drawn up for the project which is the subject of this Decision.

The first annual report on this project shall be submitted to the Commission by the authority responsible no later than 15 months after adoption of the Decision approving the project. The report shall contain the following information:

- progress of the project,

- details of any divergence from the implementation plan originally laid down,

- an outline of the main problems encountered and the measures taken to solve them.

On the basis of the information in the annual reports, the Commission and the Member State may, where necessary, revise the financing plan for the project and make adjustments to it.

The final report, to be submitted six months after physical completion of the project, shall report on the work carried out and its conformity with the Decision approving the project and give an initial appraisal of the chances of achieving the results sought.

Payment of the balance of Community assistance shall be subject to approval of the final report.

Checks

7. Checks may be carried out in accordance with Article 23 (2) of Regulation (EEC) No 4253/88 by both the Member State and the Commission. The Member State and the Commission shall immediately exchange any relevant information concerning the results.

8. For a period of three years following the last payment in respect of the project, the authority responsible for implementation shall keep available for the Commission all the supporting documents regarding expenditure.

9. The Member State shall keep available for the Commission all appropriate national reports concerning the checks carried out.

B. Assessment

10. An assessment of the project may be carried out during its implementation at the request of the Member State or on the initiative of the Commission in order to assess whether the project is progressing in accordance with the objectives originally laid down and to propose adjustments to take account of problems encountered during implementation. The Monitoring Committee shall take into account this evaluation.

11. An ex-post assessment of the impact of the project may be carried out by an assessor appointed by joint agreement between the Member State and the Commission once the project has been completed.

ANNEX V

INFORMATION AND PUBLICITY The Member State concerned should ensure that the general public are aware of the role played by the Community in financing the project. The following measures, inter alia, should be undertaken with this end in view:

- panels of an appropriate size, to be agreed between the Member State and the Commission, shall mark the project. These panels should indicate that the project in question has been funded by the Cohesion Fund of the European Community at a rate of 85 %. Appropriate European Community identity symbols should be used on every panel,

- the Member State concerned shall publicize the project using appropriate means, especially audio-visual means. Such publicity shall refer to the objectives and actions and to the benefits to the general public which will derive from the project,

- the Member State concerned shall provide the public with brochures, leaflets and other types of information. They may use Community channels for the distribution of these brochures and leaflets,

- from the outset, the Member State concerned shall ensure that there is transparent and open access to appropriate information requested by the public. With regard to environmental projects the provisions of Council Directive 90/313/EEC (1) have to be respected.

The Member State concerned shall consult the Commission on what initiatives it proposes to take in this respect within two months after the adoption of the Decision. It shall also report annually to the Commission on the information and publicity measures undertaken.

ANNEX VI

OBSERVANCE OF THE TERMS AND CONDITIONS OF THE DECISION AND OF OTHER COMMUNITY POLICIES 1. The Member State and the beneficiaries shall ensure that Community finance is used for the purposes intended.

2. Where the Commission considers that for a given project, this requirement or other provisions of the Decision or of Community policies have not been or are not being complied with, it shall conduct suitable examination of the case in particular requesting that the Member State or other authorities designated by it to implement the project submit their comments within a specified period of time.

Following this examination, the Commission may suspend payments of Community funds. In this case, it will notify the authority in the Member State responsible for implementation of the project. This letter of notification shall also state the action to be taken in respect of Community funds already paid out for the project.

3. For projects in respect of which the above steps have been taken, the current and the remaining payments shall be considered suspended totally or in part until the Commission is satisfied that the necessary remedial measures have been taken.

4. If this examination reveals finally that the proper terms and conditions of the Decision and of Community policy have not been complied with, and that corrective measures have not been taken by the Member State, the assistance shall be reduced or cancelled. Provisions concerning the recovery of funds unduly paid are set out in point 11 of Annex III.

(1) OJ No L 158, 23. 6. 1990, p. 56.

Top

托管标准,您可以接收以下服务:

1 标准定期系统查新,若有最新版本,会以站内短信或邮件的形式通知用户;

2 随时在标准托管页面中查看到该条标准的最新状态;

3 若用户有在学习和科研中的需要,可以在标准托管页面中试阅标准;

4 企业如果需要上新产品,我院及时提供标准查询、采购等方面的支持;

5 为企业在标准制修订、企业良好行为创建以及标准化试点过程中遇到的困难,可联系我院指定相关专家负责进行指导帮助、提供政策咨询;

6 为企业提供标准化政策的解读、标准化知识的推广培训、标准自我公开声明、标准文献的免费查询、企业标准化体系建设等方面的标准化服务;

进入企业标准托管

您可以通过编辑查新模板,批量查询指定标准集的最新情况。我们会通过查询,向您展示您所查询标准的:

1. 准确的标准号及标准名称(我们通过人工智能技术对您提交的标准号进行自动纠正)

2. 标准的最新状态(现行、废止或未发布)

3. 若标准已废止并被新标准替代,会反馈被替代的标准

4. 若您已托管此标准,便可以实时跟踪这个标准的最新状态

标准查新 模板下载

您可以在这里检索全球超过140万条标准,支持上百个国内国际标准组织的标准查询。您也可以在这里检索国内各类国家、部委和地方的法律法规。

更多标准子库在持续建设中。

标准检索

标准资讯点击排行榜 全部

资讯标题点击

[[ n.title ]] [[ n.read ]]

大连标准化公共服务平台

版权:大连标准化研究院有限公司

地址:大连市中山区高原街56号

电话:0411-82740851

大连标准